My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-21_PERMIT FILE - C1981010A (37)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2009-09-21_PERMIT FILE - C1981010A (37)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:40 PM
Creation date
12/1/2009 2:00:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
9/21/2009
Doc Name
Production Summary
Section_Exhibit Name
Appendix A TALPAC Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Talpac <br />TS-PR6 <br />mm? <br />Haulage System: Ash Dump <br />Haul Cycle: (PRJ] CG1 to Coyote <br />Material: PRJ To oil Roster: PRJ 5A a Week - a Hour Shifts <br />Availability % 100.00 <br />Average Bucket Volume cu.yards 3.66 <br />Bucket Fill Factor 0.83 <br />Average Payload <br />Operating Hours per Year bcy <br />OpHr/Year 2.11 <br />1,344.00. <br />Op. hrs factored by availability <br />Average Operating Shifts per Year shifts/Year 192.00 Shifts factored by availability <br /> <br />Average Bucket Cycle Time <br />min 0.02 <br />Production per Operating Hour bcy 219.61 <br />537 <br />1 <br />Max. prod..based on 100% avail. <br />Production per Loader Operating Shift bcy . <br />, <br />151 <br />295 production factored by avail. <br />Avg <br />Production per Year bcy , . <br />Wait Time per Operating Hour min 44.79 <br />.. <br />Availability :..>.,. %.. :. 84.67 <br />Payload in Template bcy 23.65 <br />Operating Hours per Year OpHrNear 1,137.92 <br />Average Payload bcy 23.25 <br />Production per Operating. Hour bcy 259.38 <br />Production per Loader Operating Shift bcy 1,537 <br />Production per Year. bcy 295,151 <br />Queue Time at Loader min/ Cycle 0.00 <br />Spot Time at loader min/ Cycle 0.50 <br />Average Loading Time min/ Cycle 0.17 <br />Average Travel Time min/ Cycle 2.80. <br />Spot Time at Dump min/ Cycle 0.50 <br /> Average Dump Time min/ Cycle 1.00 <br /> Average Cycle Time min/ Cycle 4.97 <br /> Fleet Size 1 <br /> Average No. of Bucket Passes 11.00 <br /> Production per Year bcy/Year 295,151 <br />00 <br />0 <br />Loading Methodology <br /> Discounted Capital Cost $/bcy . <br />00 <br />0 Single Sided <br /> Discounted Operating Cost $/bcy . <br />00 <br />0 Full Truck <br /> Discounted Average Cost $/bcy . Average for 150 Shifts <br />Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br />'Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br />This simulation is based on data provided by the equipment manufacturer. <br />Equipment data should be checked to ensure it is valid for this site. <br />L_I <br />15-Oct-2007 4:29 PM Page 1
The URL can be used to link to this page
Your browser does not support the video tag.