Laserfiche WebLink
Appendix A <br />R-6 Reclamation Bond-Miscellaneous Costs <br />a <br />rond Cleaning During Liability Period . <br />Assumptions: <br />During first year, - eight weeks of pond cleaning required <br />During second year - three weeks of pond cleaning <br />No pond cleaning required years 3-10 <br />Costs: <br />Equipment Type Ownership Op & OH Operator Total <br /> <br />CAT 3228 hydr. Exc. $25.64 $36.01 $32.00 $93.65 <br />End Dump Haul Truck (10 cyd) $11.39 $39.10 $30.00 $80.49 <br />End Dump Haul Truck (10 cyd) $10.25 $39.10 $30.00 $79.35 <br />Total Cost per Hour $47.28 $114.21 $92.00 $253.49 <br />Year one hours 320 <br />Year one cost $ 81,117 <br />Year two hours 120 <br />Year two cost $ 30,419 <br />Total Cost $ 111,536 <br />• <br />Revision: <br />Approved : _