My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-21_REPORT - C1981010
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981010
>
2009-09-21_REPORT - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:40 PM
Creation date
12/1/2009 10:15:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Report
Doc Date
9/21/2009
Doc Name
Horse Gulch Fill Stability Analysis, May 2009
Permit Index Doc Type
Waste Pile/Fill Report
Section_Exhibit Name
Appendix T
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 29, 2009 Page iii <br />Figure 30. Underdrain Outlet Area with Projected Sandstone Bedrock Contact ....................... 26 <br />Figure 31. Minimum Extents of Benching Slopes .....................................................................27 <br />DISCLAIMER <br />This report contains professional opinions based on site visits and information provided <br />' by Trapper Mining Inc. (TMI). Agapito Associates, Inc. (AAI) makes no warranties, either <br />expressed or implied, as to the accuracy or completeness of the information herein. Opinions <br />are based on subjective interpretations of geologic data; other equally valid interpretations may <br />' exist. It is acknowledged that these recommendations have been made based on a limited set of <br />information and, thus, there are inherent uncertainties. It is TMI's responsibility to understand <br />the recommendations presented herein and their implied risks. TMI should involve AAI in <br />' routine inspection of the underdrain construction to make any necessary changes to the <br />recommendations in this report. The true nature to subgrade conditions and the fill materials <br />will only be known once construction begins. Identification and control of hazardous conditions <br />' are the responsibilities of TMI. <br />Agapito Associates, Inc.
The URL can be used to link to this page
Your browser does not support the video tag.