My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-21_PERMIT FILE - C1981010A (34)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2009-09-21_PERMIT FILE - C1981010A (34)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:40 PM
Creation date
12/1/2009 10:15:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
9/21/2009
Doc Name
Cost Summary
Section_Exhibit Name
Appendix A Circes Cost Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />091 State : Colorado Permit/job #: C-1981-010 <br />0710712009 County : Moffat Abbreviation :none <br />JDM Site : Trapper Mine Filename : C010-091 <br />Permit or other job action :Permit Revision 06 <br />Task description :Replace Topsoil on DIE Pits <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Scraper work team -Scraper :lCat 637G w/push-pull <br />-Push dozer :FA <br />Cost Bre <br />Support equipment -Load area : Cat D10R - 10SU (2005) _ <br />-Dump area : Cat D10R - 10SU (2005) <br />Road maintenance -Motor grader : CAT 16H _ <br />-Water truck : Water Tanker, 2,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer dozer grader misctruk <br />% Utilization-machine : 100 NA 100 100 100 50 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $110.37 NA $84.86 $84.86 $56.65 $7.53 <br />Operating cost/hour : $177.86 NA $138.49 $138.49 $63.52 $7.73 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 $0.00 NA <br />Operator cost/hour : $24.95 NA $32.78 $32.78 $24.47 $33.94 <br />Unit subtotals : $313.18 NA $256.13 $256.13 $144.63 $49.20 <br />Number of units : 8 0 1 1 1 1 <br />Group subtotals : Work : $2,505.41 Support : $512.26 Maintenance : $193.84 <br />Total work team cost/hour : $3,211.51 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 488,686 BCY factor : 1.429 volume : 698,122 LCY <br />Source of quantity take-off :Appendix A Table 1.4-9 <br />Source of estimated swell factor : CAT
The URL can be used to link to this page
Your browser does not support the video tag.