Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 003 State : Colorado Permit/job# : C-1981-010 <br />Date : 0710612009 County :Moffat Abbreviation :none <br />User : JDM Site : Trapper Mine Filename : C010-003 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Revision PR-06 <br />Task description :Ash Disposal Pit Regrade <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D11R - 11 SU (2005) Horsepower : 850 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 3 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $75.81 NA <br />Operating cost/hour : $224.59 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $33.03 NA <br />Total unit cost/hour : $333.43 Total fleet cost/hour : $333.43 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 42,960 LCY factor : NA volume : 42,960 LCY <br />Source of estimated volume :Permit Appendix A, Table 1.4-2 <br />Source of estimated swell factor : Cat <br />HOURLY PRODUCTION Job Condition Correction Fact <br />Operator skill <br />Average push distance : 264 feet Material consistency <br />Unadjusted hourly production : 1,157.8 LCY/hr Dozing method <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 5.00 % (neg) <br />Average site altitude : 6,800 feet <br />Material weight : 2,475 Ibs/LCY <br />Weight description : <br />USER-PROVIDED WEIGHT DATA <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type <br />Net correction <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost : $0.418 /LCY <br />Adjusted unit production <br />Adjusted fleet production <br />Source <br />0.80 (user) <br />1.00 (Cat HB) <br />1.17 (user) <br />0.90 (user) <br />0.79 (3shifts Ida <br />1.00 (doz-oc) <br />1.11 (Cat HB) <br />1.00 (Cat HB) <br />0.93 (user) <br />1.00 (S/SU/U) <br />0.69 <br />798.37 LCY/hr <br />798.37 LCY/hr <br />Total job time : 53.81 <br />Total job cost : $17,942 <br />Hours