Laserfiche WebLink
CIRCES Cost Estimating Software <br /> BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 082 State : Colorado Permit/job# : C-1981-010 _ <br />Date : 0710712009 County :Moffat Abbreviation :none <br />User : JDM Site : Trapper Mine Filename : C010-082 <br /> <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Revision 06 <br />Task description : Regrade Far East Buzzard Impoundment <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $97.38 NA <br /> Operating cost/hour : $138.49 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $268.65 Total fleet cost/hour : $268.65 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 342 LCY factor : NA volume : 342 LCY <br /> <br />Source of estimated volume :Appendix A Table 1.4-6 <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.00 (Cat 118) <br />Unadjusted hourly production : 1,718.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.79 (Cat HB) <br />Average push gradient : 10.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,400 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2550 Ibs/LCY Net correction : 0.35 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 607.24 LCY/hr <br /> Adjusted fleet production : 607.24 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 0.56 Hours <br />Unit cost : $0.442 /LCY Total job cost : $151 <br />