Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task #: 064 <br />Date : 0710712009 <br />User: JDM <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action :Permit Revision 06 <br />Task description : Rip West Ash Haulroads (West Ash, West Ash1, and West Ash 2) <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Utilization % <br />$95.00 NA <br />$138.49 100 <br />$8.66 100 <br />$32.78 NA <br />$274.92 Total fleet cost/hour <br />s1 _n99.69 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : <br />Area : <br />Cost Breakdown : Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />NA NA <br />20.00 acres <br />Load factor : NA Bank volume <br />Rip depth (ft) : 2.50 Volume <br />NA <br />80,667 <br />BCY <br />BCY or CCY <br />Source of estimated quantity :Appendix A Table 1.4-5 <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feet/second <br />Unadjusted production : NA cu. yds./hour <br />Area : Avg. ripping depth : 2.50 feet/pass <br />Average ripping width : 8.67 feet/pass <br />Average ripping length : 500.00 feet/pass <br />Average dozer speed : 88.00 feet/minute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 1.007 acres/hour <br />Unadjusted production : 4,060.03 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 4 dozers) <br />Unit cost : $0.082 per cu. yd. <br />State : Colorado <br />County :Moffat <br />Site : TraWer Mine <br />Unadjusted production <br />per selected method : 4,060.03 cu. yds./hour <br />Site altitude : 6,400 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Adjusted unit production <br />Adjusted fleet production <br />Permit/job #: C-1981-010 <br />Abbreviation :none <br />Filename : C010-064 <br />Total job time <br />Total job cost <br />Data source : (CRG) <br />3,369.82 cu. yds./hour <br />13,479.28 cu. yds./hour <br />5.98 hours <br />$6,581