Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 049 <br />Date : 0710712009 <br />User: JDM <br />Permit/job# : C-1981-010 <br />Abbreviation :none <br />Filename : C010-049 <br />Agency or organization name: Colorado Division of Reclamation, Mining And Safety _ <br />Permit or other job action :Permit Revision 06 <br />Task description : Regrade Grouse Access Road <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br /> Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $97.38 NA <br /> Operating cost/hour : $138.49 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $268.65 Total fleet cost/hour : $1,074.59. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 10,477 B CY factor : 1.250 volume : 13,096 LCY <br /> <br />Source of estimated volume :Appendix A Table 1.4-5 <br />Source of estimated swell factor :Operator Estimate <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.80 (user) <br />Average push distance : 80 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 2,028.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 0.81 (Cat HB) <br />Average push gradient : 9.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,400 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 lbs/LCY Net correction : 0.39 <br />Weight description <br />Earth - Dry packed <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />State : Colorado <br />County :Moffat <br />Site : Trapper Mine <br />Adjusted unit production <br />Adjusted fleet production <br />4 Dozer(s) <br />$0.341 /LCY <br />Total job time <br />Total job cost <br />787.23 LCY/hr <br />3,148.92 LCY/hr <br />4.16 Hours <br />$4,469