Laserfiche WebLink
CIRCES Cost Estimatina Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 041 State :Colorado Permit/job# :C-1981-010 <br />Date : 0710712009 County:Moffat Abbreviation :none <br />User : JDM Site :Trapper Mine Filename : C010-041 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Revision 06 <br />Task description : Regrade K Pit Haul Roads (Wain, K1, K2, K3) <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 _ <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 per day_ <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown : Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Data source : (CRG) <br />Utilization % <br />$97.38 NA <br />$138.49 100 <br />$0.00 0 <br />$32.78 NA <br />$268.65 Total fleet cost/hour : $1,074.59 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 78,667 BCY factor : 1.250 volume : 98,334 LCY <br />Source of estimated volume :Appendix A Table 1.4-5 <br />Source of estimated swell factor :Operator Estimate <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.80 (user) <br />Average push distance : 80 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 2,028.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shilVday) <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth - Dry packed <br />9.00 % (I <br />6,400 feet <br />2,550 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) <br />Unit cost : $0.341 /LCY <br />Spoil pile : 0.80 (111u- <br />Push gradient : 0.81 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.39 <br /> <br />Adjusted unit production : 787.23 LCY/hr <br />Adjusted fleet production : 3,148.92 LCY/hr <br /> <br />Total job time : 31.23 Hours <br />Total job cost : $33,557