My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-21_PERMIT FILE - C1981010A (34)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2009-09-21_PERMIT FILE - C1981010A (34)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:40 PM
Creation date
12/1/2009 10:15:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
9/21/2009
Doc Name
Cost Summary
Section_Exhibit Name
Appendix A Circes Cost Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Surface Blasting Work cont'd Task #: 022 sheet 2 of 2 <br />BLASTING MATERIALS QUANTITIES QUANTITY UNIT <br />Total quantity of stemming required 15.50 cubic yards <br />Total quantity of explosives required 95,108 pounds <br />Total quantity of det. cord/fuse/wire required 13,649 lin. feet <br />Quantity of blasting caps used per blasthole 2 cap(s) <br />Total quantity of blasting caps required 864 caps <br />Quantity of primers used per blasthole 1 rimer(s) <br />Total quantity of primers required 432 rimers <br />Quantity of delays used per blasthole 3 delay(s) <br />Total quantity of delays required 1300 delays <br />HOURLY EQUIPMENT COST <br />Data source : (CRG data) <br />Drilling equipment - Drill <br />- Drill pad preparation <br />Misc. drilling support equipment <br />Misc. explosives support equipment <br />Explosives delivery/prep. - Bulk truck <br />- Cap truck <br />Shiftbasis : 1 per day <br />cription <br />:DRILL SK35, 9.0 in. <br />D10R - 10SU (2005) <br />1 Tanker, 6x4, 210 HP <br />t Duty Pickup. 4x4. 314 T. <br />Cost Breakdown : Drilling <br />Equipment Drill Pad <br />Preparation Misc. Drill Misc. Expl. <br />Support Support Explosives <br />Bulk Truck Delivery <br />Cap Truck <br />Import data filename : drilling dozer NA NA misctruk misctruk <br />Utilization -machine+att. no. 1 : 100 100 NA NA 50 50 <br />-ripper or attachment no. 2 : NA NA NA NA NA NA <br />Equipment ownership $/hr : $51.67 $84.86 NA NA $10.90 $3.31 <br />Machine+att. 1 operating $/hr : $97.57 $138.49 NA NA $15.11 $4.07 <br />Ripper or att. 2 operating $/hr : $0.00 $0.00 NA NA $0.00 $0.00 <br />Operator+additional labor $/hr : $24.73 $32.78 NA NA $33.94 $19.49 <br />Unit subtotals : $173.96 $256.13 $0.00 $0.00 $59.95 $26.87 <br />Number of units : 1 1 0 0 1 1 <br />Group subtotals : $173.96 $256.13 $0.00 $0.00 $59.95 $26.87 <br />Total work team cost/hour : $516.91 <br />MATERIALS COST <br /> Description Unit Unit Cost Quantity Total Cost <br />Blasting agent: Bulk ANFO nom. density pound $0.207 95,107.72 $19,724.39 <br />Primers or boosters : Cast primer, 2.0 lb each $6.213 432.00 $2,683.80 <br />Blasting caps: Non-electric cap, delay each $2.990 864.00 $2,583.10 <br />Det. cord, fuse or wire : Detaline Detacord, 2.4 go linear foot $0.120 13, 648.80 $1,639.52 <br />Delays: MS connectors each $4.226 1,300.00 $5,493.54 <br /> <br />Miscellaneous : <br />none required <br />NA <br />$0.00 <br />0.00 _ <br />$0.00 <br />Drill bits' : bit life = 1,750.0 linear feet $2,279.00 2.86 $6,516.64 <br />* bit life unit = linear foot, bit cost unit = each (per bit) Total materials cost : $38,640.99 <br />DRILLING AND EXPLOSIVES PREPARATION TIME <br /> Job Condition Correction Factors - Site altitude : 7,100 feet <br /> Altitude adjustment : 0.95 (DMG est.) <br />Total drilling length : 5,004 linear feet Job efficiency factor : 0.67 (Ch. Exc. HB) <br />Unadjusted drilling rate : 82.00 feet/hour Adjusted drilling rate : 52.19 feet/hour <br />Drllinq time : 95.87 hours Explosives prep. time : 76.31 hours <br />JOB TIME AND COST Total job time : 172.19 hours <br />Total unit cost : $1.955 per cu. yd. Total job cost : $86,501
The URL can be used to link to this page
Your browser does not support the video tag.