Laserfiche WebLink
CIRCES Cost Estimatinq Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 016 <br />Date : 0710712009 <br />User: JDM <br />State : Colorado <br />County :Moffat <br />Site :Trapper Mine <br />Permit/job# : C-1981-010 <br />Abbreviation :none <br />Filename : C010-016 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And <br />Permit or other job action : Permit Revision PR-06 <br />Task description : G Dip Pit Middle (Post Slide) <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D11R - 11SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br />Horsepower: 850 <br />Shiftbasis : 3 per day <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $85.09 NA <br /> Operating cost/hour : $224.59 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $33.03 NA <br /> Total unit cost/hour : $342.71 Total fleet cost/hou r : $1,713.55 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 729,232 LCY factor : NA volume : 729,232 LCY <br /> <br />Source of estimate d volume: Permit Appendix A, table 1.4-3 <br />Source of estimated swell factor : Cat <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.80 (user) <br />Average push distance : 273 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,115.6 LCY/hr Dozing method : 1.17 (user) <br /> Visibility: 0.90 (user) <br />Material consistency description : Job efficiency : 0.79 (3shifts /day) <br />Consolidated stockpile Spoil pile : 1.00 (doz-oc) <br /> Push gradient : 1.22 (Cat HB) <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,400 feet Material weight : 0.93 (user) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,475 Ibs/LCY Net correction : 0.76 <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />Adjusted unit production : 845.17 LCY/hr <br />Adjusted fleet production : 4,225.84 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 5 Dozers) Total job time : 172.57 Hours <br />Unit cost : $0.405 /LCY Total job cost : $295,699