Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 014 <br />Date : 0710712009 <br />User: JDM <br />Permit/job# : C-1981-010 <br />Abbreviation :none <br />Filename : C010-014 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Revision PR-06 <br />Task description : G Dip Pit West Regrade (Post Side) <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />State : Colorado <br />County :Moffat <br />Site : Trapper Mine <br />Basic machine : Cat D11 R - 11 SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :NA - <br />Horsepower : 850 <br />Shiftbasis : 3 per day <br /> Data source : (CRG) <br /> Utilization % <br />Ownership cost/hour : $85.09 NA <br />Operating cost/hour : $224.59 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $33.03 NA <br />Total unit cost/hour : $342.71 Total fleet cost/hour : $2,398.97 <br /> <br />Swell Loose <br />LCY factor : NA volume : 358,316 LCY <br />MATERIAL QUANTITIES <br />Initial <br />volume : 358.316 <br />Source of estimated volume : Permit Appendix A, table 1.4-3 <br />Source of estimated swell factor : Cat <br />HOURLY PRODUCTION Job Condition Correction Factors <br /> Operator skill : 0.80 <br />Average push distance : 315 feet Material consistency : 1.00 <br />Unadjusted hourly production : 955.8 LCY/hr Dozing method : 1.17 <br /> Visibility: 0.90 <br />Material consistency description : Job efficiency : 0.79 <br />Consolidated stockpile Spoil pile : 1.00 <br /> Push gradient : 1.22 <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 <br />Average site altitude : 6,400 feet Material weight : 0.93 <br /> Blade type : 1.00 <br />Material weight : 2475 Ibs/LCY Net correction : 0.76 <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />JOB TIME AND COST <br />Fleet size : 7 Dozer(s) <br />Unit cost : $0.473 /LCY <br />Source <br />(Cat HB) <br />(user) <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time : <br />Total job cost : <br />LCY/hr <br />LCY/hr <br />Hours <br />724.10 <br />5,068.73 <br />70.69 <br />$169,587