Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 008 <br />Date : 0710612009 <br />User: JDM <br />State : Colorado <br />County :Moffat <br />Site : Trapper Mine <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Revision PR-06 <br />Task description : F Pit Regrade (Spoil Side 2) <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D11R - 11SU (2005) Horsepower : 850 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis :_ 3 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $75.81 NA <br />Operating cost/hour : $224.59 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $33.03 NA <br />Total unit cost/hour : $333.43 Total fleet cost/hour : $3,000.86 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,363,704 LCY factor : NA volume : 2,363,704 LCY <br />Source of estimated volume : Permit Appendix A, table 1.4-3 <br />Source of estimated swell factor : Cat <br />HOURLY PRODUCTION Job Condition Cc <br />Average push distance : 389 feet <br />Unadjusted hourly production : 788.5 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 10.00 % (neg) <br />Average site altitude : 7,000 feet <br />Material weight : 2475 Ibs/LCY <br />Weight description : <br />USER-PROVIDED WEIGHT DATA <br />JOB TIME AND COST <br />Fleet size : 9 Dozer(s) <br />Unit cost : $0.558 /LCY <br />Operator skill : 0.80 <br />Material consistency : 1.00 <br />Dozing method : 1.17 <br />Visibility: 0.90 <br />Job efficiency : 0.79 <br />Spoil pile : 1.00 <br />Push gradient : 1.22 <br />Altitude : 1.00 <br />Material weight : 0.93 <br />Blade type : 1.00 <br />Net correction : 0.76 <br />Adjusted unit production <br />Adjusted fleet production <br />Permit/job# : C-1981-010 <br />Abbreviation :none <br />Filename :C010-008 <br />Source <br />(user) <br />(Cat HB) <br />(user) <br />_ (user) <br />3shifts /dr, <br />(doz-oc) <br />(Cat HB) <br />(Cat HB) <br />597.36 LCY/hr <br />5,376.24 LCY/hr <br />Total job time : 439.66 <br />Total job cost : $1,319,350 <br />Hours