My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-25_PERMIT FILE - M2009035
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009035
>
2009-11-25_PERMIT FILE - M2009035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:14 PM
Creation date
11/30/2009 7:58:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009035
IBM Index Class Name
PERMIT FILE
Doc Date
11/25/2009
Doc Name
Response to second adequacy review
From
Austin Civil Group, Inc.
To
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 12 APPLICATION PAGE 14 OF 35 <br />3.1.3 Time Limit and Phased Reclamation <br />Mining at this site will be progressive. Backfill placement required for <br />site reclamation work will occur behind the sand and gravel high <br />wall. Topsoil placement, mulching, seeding, and fertilizing activities <br />may be delayed until all sand and gravel has been mined from the <br />site. Final Reclamation for the 30.25-acre area is anticipated to <br />require six months to complete. <br />3.1.4 Public Use <br />The owner will not allow public use of the permit area for recreation <br />purposes during mining operations. <br />3.1.5 Reclamation Measures - Material Handling <br />(I.) Reclamation grading for this project will be performed in <br />accordance with the Exhibit F drawings included with this <br />application. The reclamation plans will restore the site to <br />essentially a pre-mining topographic condition, and planted with <br />Jose Tall Wheatgrass, Alkali Sacaton, Western Wheatgrass, and <br />Galleta. <br />(2.) Backfilling will be accomplished using existing site overburden, and <br />imported inert fill materials. Backfill areas will be compacted to <br />minimize settlement. No hazardous fill material will be used at the <br />site. <br />(3.) Runoff generated within the project site will be permitted to be <br />released offsite in accordance with the Process Waters Storm <br />Water Management Permit. All grading will be such that all work <br />areas will drain towards the settling ponds located at near the <br />southwest corner of each of the respective mining areas. All <br />mined areas will be backfilled and compacted to the grades <br />specified in the reclamation plan map. <br />(4.) The permit area will be progressively mined and backfilled. The <br />overburden material removed as mining progresses across the site <br />will be used as backfill material, in addition to imported inert fill, <br />along the bottom of the proposed ponds. Deep tilling, topsoil <br />placement, mulching, seeding, and fertilizing work will commence <br />when all sand and gravel has been mined from the site. Mining for <br />the sand and gravel is expected to require 5 years to complete. <br />Once all sand and gravel material stockpiles are depleted, the <br />5.97 acres within the mining area above the water elevation within <br />the ponds will be deep tilling, mulched, seeded and fertilized <br />which will require a minimum of three months to complete. <br />(5.) No refuge, acid forming, or toxic producing materials are <br />expected to be encountered during this operation. If these <br />materials are exposed, they will be addressed in accordance with <br />the State of Colorado requirements <br />(6.) All drill and auger holes that are part of the permit area will be <br />removed during the sand and gravel mining process. <br />(7.) The site will be backfilled and graded in accordance with the <br />reclamation plan. No slopes will be greater than 3:1. <br />(8.) No agriculture or horticulture use is expected at the site.