Laserfiche WebLink
W-Weiland. Inc. <br />Environmental & Engineering <br />Environmental Support for; <br />November 24, 2009 <br />• Transportation <br />• Land Development <br />Michael Cunningham <br />Environmental protection Specialist • Mining <br />Colorado Division of Mining Reclamation & Safety • Industry <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80202 <br />Re: Bonser Pit M- 2000 -156 <br />Dear Michael, <br />On behalf of Coulson Excavating Co., Inc., we hereby request a waiver for the 30 day <br />waiting period between a reason to believe a violation exists and a hearing by the Mined <br />Land Reclamation Board (MLRB). We request that the issue pertaining to the reason to <br />believe a violation exists letter date November 23, 2009 be heard at the December 9th <br />MLRB hearing. <br />Sincerely, <br />Peter Wayland <br />President <br />PC 60X 16067 , BOULDER CO 60309 <br />ph 303- 443 -9521 fax 303- 443 -9536 <br />