Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ Permit Field Visit Continuation Pa <br />Person KERB COAL CO. Number C- 006 -80 Date 10/23/2007 e <br />g <br />28. Performance Standard Categories <br />Codes: 1= Compliance, 2= Noncompliance, 3 =Not Planned, 4 =Not Started, 5= Noncompliance Identified Elsewhere, 6= Previously Cited <br />A. Administrative <br />D. Backfilling & Grading <br />H. Subsidence Control Plan <br />1. 1 <br />Mining within Valid Permit <br />1. <br />Exposed Openings <br />- <br />I. Roads <br />2. 1 <br />Mining within Bonded Area <br />0 <br />2. <br />Contemporaneous Reclamation <br />1. 1 Road Construction <br />3. 1 <br />Terms & Conditions of Permit <br />3. <br />Approximate Original Contour <br />2. 1 Certification <br />4. _ <br />Liability Insurance <br />4. <br />Highwall Elimination <br />3. 1 Drainage <br />5. 1 <br />Ownership and Control <br />5. <br />3 Steep Slopes (includes downslope) <br />4. 1 Surfacing and Maintenance <br />6. <br />Temporary Cessation <br />6. <br />3 Handling of Acid & Toxic Materials 5, 1 Reclamation <br />7. 3 <br />AML Rec. Fees -- Non - Respondent <br />7. <br />1 Stabilization (rills and gullies) <br />J. Si & Markers <br />8. 3 <br />AML Rec. Fees -- Failure to Pay <br />E. Excess Spoil Disposal <br />1. 1 Si s <br />Zm <br />B. Hydrologic Balance <br />g <br />1. <br />3 Placement <br />2. 1 Markers <br />1. 1 <br />Drainage Control <br />2. <br />3 Drainage Control <br />K. Prohibitions <br />2. <br />Inspections & Certifications <br />3. <br />3 Surface Stabilization <br />_Distance <br />L Revegetation <br />L. <br />3. <br />Siltation Structures <br />4. <br />3 Inspections &Certif cations <br />1. 1 Vegetative Cover <br />4. - <br />Discharge Structures <br />F. Coal Mine Waste <br />2. 1 Timing <br />5._ <br />Diversions <br />(Refuse Piles /Impoundments) <br />3 <br />M. 1 Postmining Land Use <br />6. <br />Effluent Limits <br />1. <br />Drainage Control <br />7. <br />Ground Water Monitoring <br />2. <br />3 Surface Stabilization <br />N. Other <br />8. <br />Surface Water Monitoring <br />3. <br />3 Placement <br />General <br />9. 3 <br />Drainage -- Acid -Toxic Materials <br />4. <br />3 Inspections and Certifications Performance <br />10. 1 <br />Impoundments <br />5. <br />3 Impounding Structures <br />Catagor/ <br />11._ <br />Stream Buffer Zones <br />G. Use <br />Of Explosives <br />P hase <br />L 1 1) p hase 3 Bond Release <br />I) <br />C. Topsoil & Subsoil <br />1. <br />3 Blaster Certification <br />Removal <br />2. <br />3 Distance Prohibitions <br />2) <br />2. <br />Substitute Materials <br />3. <br />3 Blast Survey /Schedule <br />- - <br />3. <br />Storage and Protection <br />4. <br />3 Warnings & Records <br />4. 1 <br />Redistribution <br />5. <br />3 Control of Ad verse Effects <br />- -3) <br />Performance Standard Catagories <br />E. <br />30 CFR Counterpart <br />DrainageControl ................................................... <br />1 <br />A Administrative .......................................... ............................... 2. <br />3. <br />1 . Valid Permit ............................. ............................... <br />.........................773.11 <br />4. <br />2. Mining within Bonded Area ..............'........ <br />.........................773.11 <br />..........................83(a) <br />3. Terms & Conditions of Permit .................... <br />.........................773.17 <br />F. <br />4. Liability Insurance ........ ............................... <br />.........................800.60 <br />1 <br />5. Ownership and Control ............................... <br />.........................778.13 <br />2. <br />6. Temporary Cessation ........ ......................842.11(e) <br />Fees Non- Respondant <br />& 816/817.131 <br />3 • <br />7. AML Rec. -- .......... <br />......................870.15(b) <br />4 • <br />8. AML Rec. Fees -- Failure to Pay ............... <br />......................870.15(a) <br />5. <br />B. Hydrologic Balance ...................... ................(816 /817.41 -57) <br />G <br />1. Drainage Control ........................................... .............................45 <br />1 • <br />2. Inspections & Certifications ....................... <br />......................49(a)(10) <br />2. <br />3. Siltation Structures ......................................... .............................46 <br />3. <br />4. Discharge Structures ...................................... <br />.............................47 <br />4. <br />5 Diversions ...................................................... <br />.............................43 <br />5. <br />6 . Effluent Limits ............................................... <br />.............................42 <br />l I (a),(b), &(c) <br />7. Ground Water Monitoring ............................ <br />..........................41(c) <br />H. <br />8. Surface Water Monitoring ............................ <br />..........................41(e) <br />1 <br />9. Drainage- -Acid - Toxic Materials ................. <br />..........................41(f) <br />............................113 <br />10 Impoundments ............................................... <br />.............................49 <br />1. <br />2. <br />11. Stream Buffer Zones ..................................... <br />.............................5 j <br />3. <br />C. Topsoil & Subsoil ................ ............................... <br />( 816/817.22 <br />4. <br />1 . Removal ........................................................ <br />..........................22(a) <br />5. <br />2. Substitute Materials ....................................... ..........................22(c) <br />J. <br />3. Storage and Protection ................................... <br />..........................22(c) <br />4. Redistribution ................................................ <br />..........................22(d) <br />1. <br />2. <br />D. Backfilling & Grading ............... ...............(816 /817.95 -107) <br />K. <br />1. Exposed Openings . ....................816 /817.13, <br />14, 15, & 823.11 & 21 <br />L• <br />2. Contemporaneous Reclamation ...................... <br />............................100 <br />1 <br />3. Approximate Original Contour .................... <br />......................102(a)(1) <br />2. <br />4. Highwall Elimination ................................... <br />......................102(a)(2) <br />5. Steep Slopes (includes downslope) ................ <br />............................107 <br />M. <br />6. Handling of Acid & Toxic Material s ............. <br />.........................102(c) <br />7. Stabilization (rills and gullies); ................................................. 95(b) <br />Excess Spoil Disposal ........................... ................(816 /817.71 -74) <br />Placement................................................................. <br />..........................71(e) <br />DrainageControl ................................................... <br />.............................71 0 <br />Surface Stabilization ................................................. ..........................71(g) <br />Inspections & Certifications ..................................... <br />..........................71(h) <br />Coal Mine Waste (Refuse Piles /Impoundments) <br />•••••(816/817.81 -84) <br />Drainage Control ..................................................... <br />..........................83(a) <br />Surface Stabilization ................................................ <br />..........................83(b) <br />Placement ............................................................ ............................... <br />83(c) <br />Inspections and Certifications ................................. <br />..........................83(d) <br />Impounding Structures .............................................. <br />............................84 ' <br />Use of Explosives ................... ............................... <br />816/817.61 -68 ) <br />Blaster Certification ................................................. <br />..........................61(c) <br />Distance Prohibitions ............................................... <br />..........................61(d) <br />Blast Survey / Schedule ............................................. <br />..........................62 -64 <br />Warnings Records ......................................... .............................66 <br />& 68 <br />Control of Adverse Effects ........................................ <br />.............................67 <br />Subsidence Control Plan ....................... ..................(817.121 -122) <br />Roads ................. ............................... .................(816 /817.150 -151) <br />Road Construction .................................................. <br />.........................150(c) <br />Certification............................................................. <br />.........................151(a) <br />Drainage .................... ............................... ............................150 <br />b)- 151(d) <br />Surfacing and Maintenance ...................... ............................150 <br />e)- 151(d) <br />Reclamation......................................................... .............................15 <br />00 <br />Si & Markers ..... ............................... ...................(816 <br />/817.11) <br />Signs...................................................... ............................... <br />l I (a),(b), &(c) <br />Markers ....................................... ................... ............. <br />l l (a),(b),(d),(e), &(f) <br />Distance Prohibitions . ............................... .......................(761.11) <br />Revegetation ... ............................... ...................(816 /817.111 -116) <br />Vegetative Cover ............ ............................... ............................111 <br />& 116 <br />Timing....................................... ............................... <br />............................113 <br />Postmining Land Use ............................ ..................(816 /817.133) <br />Revised December 4, 1998 Page 2 of <br />