Laserfiche WebLink
Colowyo Mine C- 1981 -019 -10 November 2009 Inspection <br />Prospect Ditch Channel Profile Data <br />Prospect <br />Ditch <br />GPS Pt <br />Tot. Dist (ft) <br />Distance Diff. <br />GPS Elevation <br />Elev. Diff. <br />Slope <br />Design Elev. <br />Elev. Diff. <br />Slope <br />0 <br />0.0 <br />0.0 <br />7,120.1 <br />0.0 <br />7,025.0 <br />1 <br />49.5 <br />49.5 <br />7,133.6 <br />13.5 <br />27.3% <br />7,040.0 <br />15.0 <br />30.3% <br />2 <br />95.9 <br />46.4 <br />7,145.3 <br />11.7 <br />25.2% <br />7,050.0 <br />10.0 <br />21.6% <br />3 <br />149.4 <br />53.5 <br />7,159.9 <br />14.6 <br />27.3% <br />7,060.0 <br />10.0 <br />18.7% <br />4 <br />200.6 <br />51.2 <br />7,177.2 <br />17.3 <br />33.8% <br />7,065.0 <br />5.0 <br />9.8% <br />5 <br />255.9 <br />55.3 <br />7,190.6 <br />13.4 <br />24.2% <br />7,075.0 <br />10.0 <br />18.1% <br />6 <br />313.9 <br />58.0 <br />7,207.4 <br />16.8 <br />29.0% <br />7,090.0 <br />15.0 <br />25.9% <br />7 <br />364.6 <br />50.7 <br />7,219.7 <br />12.3 <br />24.3% <br />7,100.0 <br />10.0 <br />19.7% <br />8 <br />422.8 <br />58.2 <br />7,237.4 <br />17.7 <br />30.4% <br />7,115.0 <br />15.0 <br />25.8% <br />9 <br />503.5 <br />80.7 <br />7,258.8 <br />21.4 <br />26.5% <br />7,135.0 <br />20.0 <br />24.8% <br />10 <br />609.3 <br />105.8 <br />7,279.7 <br />20.9 <br />19.8% <br />7,155.0 <br />20.0 <br />18.9% <br />11 <br />903.3 <br />294.0 <br />7,333.4 <br />53.7 <br />18.3% <br />7,185.0 <br />30.0 <br />10.2% <br />12 <br />986.2 <br />82.9 <br />7,349.2 <br />15.8 <br />19.1% <br />7,210.0 <br />25.0 <br />30.2% <br />13 <br />1,091.6 <br />105.4 <br />7,366.1 <br />16.9 <br />16.0% <br />7,250.0 <br />40.0 <br />38.0% <br />14 <br />1,173.2 <br />81.6 <br />7,379.2 <br />13.1 <br />16.1% <br />7,270.0 <br />20.0 <br />24.5% <br />15 <br />1,260.8 <br />87.6 <br />7,391.0 <br />11.8 <br />13.5% <br />7,280.0 <br />10.0 <br />11.4% <br />16 <br />1,352.9 <br />92.1 <br />7,402.8 <br />11.8 <br />12.8% <br />7,300.0 <br />20.0 <br />21.7% <br />17 <br />1,465.4 <br />112.5 <br />7,413.9 <br />11.1 <br />9.9% <br />7,325.0 <br />25.0 <br />22.2% <br />18 <br />1,577.7 <br />112.3 <br />7,425.1 <br />11.2 <br />10.0% <br />7,350.0 <br />25.0 <br />22.3% <br />19 <br />1,641.9 <br />64.2 <br />7,432.7 <br />7.6 <br />11.8% <br />7,365.0 <br />15.0 <br />23.4% <br />20 <br />1,690.8 <br />48.9 <br />7,437.7 <br />5.0 <br />10.2% <br />7,380.0 <br />15.0 <br />30.7% <br />21 <br />1,792.3 <br />101.5 <br />7,453.6 <br />15.9 <br />15.7% <br />7,400.0 <br />20.0 <br />19.7% <br />22 <br />1,897.3 <br />105.0 <br />7,466.2 <br />12.6 <br />12.0% <br />7,420.0 <br />20.0 <br />19.0% <br />23 <br />1,996.7 <br />99.4 <br />7,479.9 <br />13.7 <br />13.8% <br />7,435.0 <br />15.0 <br />15.1% <br />24 <br />2,132.9 <br />136.2 <br />7,496.0 <br />16.1 <br />11.8% <br />7,450.0 <br />15.0 <br />11.0% <br />25 <br />2,235.5 <br />102.6 <br />7,507.0 <br />11.0 <br />10.7% <br />7,460.0 <br />10.0 <br />9.7% <br />26 <br />2,362.0 <br />126.5 <br />7,521.2 <br />14.2 <br />11.2% <br />7,475.0 <br />15.0 <br />11.9% <br />27 <br />2,510.1 <br />148.1 <br />7,536.8 <br />15.6 <br />10.5% <br />7,490.0 <br />15.0 <br />10.1% <br />A: Data taken with Trimble GeoXT GPS Unit on 11 November 2009 <br />B: Relative Elevation - not based on a control point <br />C: Design Elevation from Map 33 - Post - Mining Permanent Drainage Profiles <br />D: The portion of the Prospect Ditch between points 10 and 11 is not contrructed yet <br />