My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-18_INSPECTION - C1980006
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980006
>
2009-11-18_INSPECTION - C1980006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:04 PM
Creation date
11/24/2009 2:58:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
INSPECTION
Doc Date
11/18/2009
Doc Name
Inspection Report
Inspection Date
11/16/2009
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a complete inspection conducted by Janet Binns of Colorado Division of Reclamation, Mining <br />and Safety. The mine is a reclaimed surface mine. The weather was cool, windy and dry. The main gate <br />on the mine access road and the gate to the load out remain locked. The mine site and load out are snow <br />covered with 4 -6 inches of snow. Elk tracks were noted across the Mine access road. <br />Roads The mine access road was snow covered. The access road was drivable all the way to the <br />facilities pad and warehouse. Fresh tire tracks went to the warehouse area. No vehicles were on site at <br />the time of the inspection. The access road to the load out was also snow covered. <br />Hydrologic Balance: The Load Out was not discharging and the permanent pool of water was frozen. <br />Reclamation Success: The Division continues to retain liability bond for two reclaimed areas at the mine <br />site, encompassing 8 acres along with the as the access road. The Division continues to retain liability <br />bond for the Load out and load out access road as well. The vegetation at both parcels look good and <br />have dried down for the year. There was evidence of vehicle access to power poles east of the <br />warehouse area. No erosional features were evident. <br />Offsite support facilities: There has been no new activity at the load out. No problems noted with the <br />load out pond or with the reclaimed load out area. <br />Records: Records were checked at the NWCC office in Steamboat on 11/18/2009. Most records are up <br />to date. Several records need to be filed as noted on attached form. The Insurance Certificate needs to <br />be updated at the NWCC office. <br />3 of 6 WHITE - File YELLOW - Operator PINK - Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.