Laserfiche WebLink
Table of contents -continued <br />• Subject Pa s Volume <br />3.3.2 Management of Development Drill Holes 3-24 III <br />3.3.2.1 Drill Sites in Areas W here Topsoil 3-24 -3-27 III <br /> Has Nol Been Salvaged <br />3.3.2.2 Drill Sites in Areas Where Topsoil 3-27 III <br /> Has Been Salvaged <br />3.3.2.3 Areas Not to be Drilled Within the 3-27 III <br /> Permit Boundary <br />3.3.2.4 Suitable Materials for Abandoned Drill Holes 3-27 III <br />3.3.2.5 Technical Revision, TR-68, 1995 Deep 3-27 III <br /> Development Drill Holes <br />3.3.3 East Panel Landslide Geotechnical Investigations 327a III <br />3.4 Blasting 3-28 III <br />3.4.1 Pre-Blast Survey 3-28 III <br />3.4.2 Public Notice 3-29 III <br />• 3.4.3 Blasting Operations 3-30 -3-32 III <br />3.4.4 Records 332 -3-36 III <br />3.5 Backfilling and Grading 337 III <br />3.5.1 Methods and Equipment 3-37 -3-38 III <br />3.5.2 Timing 3-38 -3-40 III <br />3.5.3 Post Mining Contours 340 - 3-43a III <br />3.5.4 Regrading Boxcut Spoils 3-44 -3-45 III <br />3.5.5 Final Highwalls 3-45 -3-46 III <br />3.5.6 Covering Coal and Acid or Toxic Forming 346 - 348 III <br /> Material <br />3.5.7 Non-Applicable Situations 348 - 350 III <br />3.6 Revegetation Plan 3-51 III <br />3.6.1 Major Revegetation Issues for Trapper Mine 351 III <br />3.6.1.1 Soil Depth and Quality 351 - 355 III <br />3.6.1.2 Erosion 355 -3-58 II I <br />• 3.6.1.3 Plant Species Diversity 3-59 - 3-66 III <br /> Revision: T R - 9 9 <br /> '-7 APPR0~1~~ 6~9A~ 2 7 ~~67 <br /> Approve <br />