Laserfiche WebLink
<br />A <br />N <br />v <br />o- <br /> <br />G <br />--1 <br />rn <br />?? rn 10 <br />C ? <br />,?d z <br />Table 4.9-2-1 cont - page 2 <br />• <br />• <br />Topsoil <br />Pile ID <br />Location Coordinates <br />North <br />East Size <br />(acres) Approximate <br />CYDS Created <br />Date <br />EP2 East Pyeatt Dam #1 East 412,150 1,426,900 0.4 3,700 1988 <br />EP3 East Pyeatt Dam 42 West 413,100 1,426,350 0.7 7,500 1988 <br />EP4 East Pyeatt Dam #2 East 413,200 1,426,750 0.4 4,500 1988 <br />FS7 Anfo silo 410,250 1,410,950 0.2 550 1/80 <br />FS2 E fuel storage area pile 405,450 1,418,100 1.8 17,929 12178 <br />GP-1-93 Grouse Pond 412,925 1,429,530 0.9 13,212 1993 <br />HN-2-93 H pit North #2 412,720 1,422,940 3.3 95,666 1993 <br />HR1 D haul road east (prestrip to E pit) 402,400 1,416,500 2.5 6,700 12178 <br />HR2 D haulroad west 402,800 1,416,650 1.9 10,900 12178 <br /> (prestrip to ramp #2) <br />HR3 E haul road runaway site 404,550 1,417,900 0.5 3,779 pre 12/77 <br />HR4 D haul road anfo site to S curve 404,400 1,417,450 1.6 10,621 pre 12/77 <br />HW-1-93 H pit West #1 411,540 1,422,060 4.7 176,308 1993 <br />JG1 Johnson Gulch Dam #7A 411,700 1,419,700 1.6 25,116 6180 <br />JG2 Johnson Gulch Dam #8 412,500 1,420,150 1.2 15,458 1/86 <br />JG3 Johnson Gulch Dam #9 413,100 1,420,300 1.4 14,269 1986 <br />JG4 Johnson Gulch Dam #10 414,250 1,419,950 1.8 25,777 1987 <br />JG5 Johnson Gulch Elect Station 414,250 1,419,450 0.5 6,209 1989 <br />JG6 North A Haul Road Johnson 413,000 1,420,950 1.3 13,212 1987 <br />JG7 North A Haul Road Ag Field W 412,400 1,422,250 0.6 16,850 1988 <br />JG8 North A Haul Road Ag Field E 412,300 1,422,700 0.8 12,840 1988 <br />LG1 Low grade coal topsoil pile 406,800 1,418,500 2.6 98,350 6/85 <br />MA-7-93 Middle A pit #7 410,230 1,426,420 0.9 18,648 1993 <br />MA92-1 Middle Pyeatt Regrade Spoils 409,800 1,426,000 6.0 179,676 1992 <br />MD92-1 D Pit Middle 403,600 1,418,600 2.3 45,450 1992 <br />ME-5-93 Middle E pit #5 403,955 1,419,950 0.8 5,688 1993 <br />MH1 Main haul road north 411,650 1,418,650 1.1 27,334 1/86 <br />MH2 Main haul road south 410,800 1,418,550 1.3 35,216 12/82 <br />MP1 Middle Pyeatt Dam #1 412,200 1,425,030 0.6 4,200 1986 <br />M132 Middle Pyeatt Dam #2 413,000 1,425,220 1.3 12,500 1986 <br />MP3 North A Haul Road Study Plot 411,200 1,424,650 9.5 331,974 1988 <br />MP5 New A road near anfo silo 411,570 1,424,400 0.2 2,578 6/90 <br />MP7 Middle Pyeatt Sediment Basin 411,000 1,425,350 0.2 645 1991 <br />MPT7 Middle Pyeatt Temp (N Ramp Access) 410,630 1,425,000 0.6 2,952 1991 <br />cont. <br />2/94 <br />I