• Spillways <br />Each sediment pond at Trapper incorporates either a combination of a principal and emergency <br />spillway, or a single open-channel spillway design. Regardless of the design chosen, each <br />emergency spillway or single open-channel spillway will safely pass a 25-year, 24-hour <br />precipitation event. Where a combination of a principal and emergency spillway is used, the last <br />pond in each series shall safely pass a 10-year, 24-hour precipitation event. <br />All sediment ponds built at Trapper prior to 1986, with the exception of Coyote, have standpipes <br />as principal spillways. The configuration of these spillways is shown in Figure 4.8-3, Typical <br />Standpipe Design. Spillway discharge rates for each of these ponds are shown in Appendix Q, <br />Section XIV. The location of these spillways with respect to the embankment and emergency <br />spillways is shown in Figure 4.8-4. This type of spillway has not been incorporated into any new <br />pond designs at Trapper since 1985. <br />The spillways built after 1985 have been designed as open channel structures constructed at one <br />side of the sedimentation pond embankment. The locations of the spillways are shown in Figure <br />4.8-5, Plan View of Typical Sedimentation Pond Embankment and Spillways. <br />Various open-channel spillway designs have been incorporated into the pond designs since 1985. <br />The first generation consisted of a combination principle and emergency spillway design using a <br />semi-circular corrugated metal flume anchored in a concrete base as the principal spo way. This <br />design evolved into constructing a concrete lined V-notch or flat bottom channel in place of the <br />corrugated hatr--pipe design. With each of these designs, the half-pipe, V-notch or flat bottom <br />channel is excavated and constructed in the center of a typically flat bottom emergency spillway. <br />• Details of these designs are shown in pages 4-195 thnr 4-196b, and in AppendtK Q, Section XIX. <br />Recent designs are based on providing for a single open-channel spillway pursuant to Section <br />4.05.6(3)(e) of the regulations. The design of single open-channel spillways makes use of either <br />a non-erodible channel designed to carry sustained flows, and/or an earth-lined or grass-lined <br />channel designed to carry short-tern infrequent flows at non-erostve velocities where sustained <br />flows are not expected. The typical configuration of this design is shown on page 4-196c, Typical <br />Single Open-Channel Spillway Configuration. <br />Unless otherwise approved by the'Division, the side slopes of all emergency spillways and the <br />side slopes of single open-channel spillways will be 3H:1 V with the bottom designed to slope <br />downstream at 1%. Emergency spillways and single open-channel spillways are constructed <br />such that the minimum elevation of the top of the settled embankment shall be at least 1.0 That <br />above the water surface on the pond with emergency spillway flowing at design depth. <br />• <br />Pe, -y <br />4-192 __p?A'f 13 1998