My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-21_PERMIT FILE - C1981010A (46)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2009-09-21_PERMIT FILE - C1981010A (46)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:40 PM
Creation date
11/24/2009 12:53:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
9/21/2009
Doc Name
pgs 3-1 to 3-101
Section_Exhibit Name
3.0 Project Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.3.3 East Panel Landslide Geotechnical Evaluation <br />An East Panel landslide occurred on October 8, 2006. A geotechnical evaluation of the <br />slide area was designed by Agapito Associates. This evaluation is designed to determine <br />the slide plane and to determine parameters for future development of G and K pits. The <br />evaluation also includes sites in Z dip pit. A description of the sites is shown on Tables <br />3.3-1 and 3.3-2 and 3.3-3. <br />Nine holes were cored from February - April, 2007. The remaining ten holes will be <br />completed during the summer 2007 project season. A total of three sites will be <br />completed with inclinometers, four sites with piezometers and all the sites will have <br />surface benchmarks. Surface benchmarks are used to monitor changes in down-dip <br />displacements over time. Data retrieved from inclinometers includes deflection of casing <br />as a function of depth below the collar. Plots are developed of deflection versus depth. <br />Piezometers will be used to monitor water levels. Planned instrumentation is shown in <br />Table 3.3-3 <br />The monitoring frequency for 2007 will be in accordance with the recommendations of <br />Agapito Associates Inc. and is described as follows: <br />It is recommended that measurements on the benchmarks, inclinometers and piezometers <br />should be made on the following schedule: <br />• Once per month during the dry season <br />• Once per week during the wet spring (April-May) and fall (September-October). <br />• Once per day after major precipitation (rainstorm) events >0.50 inches for 3-4 <br />days transitioning to weekly for 1-2 weeks and back to a normal schedule <br />thereafter. <br />Depending on monitoring results, Agapito Associates may recommend an increase or <br />decrease in monitoring frequency for certain sites. <br />Trapper will report monitoring results to DRMS semiannually in conjunction with the <br />annual report in March and again in September. <br />3-27a
The URL can be used to link to this page
Your browser does not support the video tag.