My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-21_PERMIT FILE - C1981010A (46)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2009-09-21_PERMIT FILE - C1981010A (46)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:40 PM
Creation date
11/24/2009 12:53:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
9/21/2009
Doc Name
pgs 3-1 to 3-101
Section_Exhibit Name
3.0 Project Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Flintlock Pit Mining Area <br />The Baby Doe and Queen Anne draglines have been the primary stripping machines for this area. <br />Located in the East Pyeatt drainage, mining in these F-pit dip line cuts will advance to the east for the <br />2008-2012 permit term. Refer to the M10 series maps for a yearly detail of the mining and reclamation <br />sequences for the 2008-2012 permit term. <br />Kimber Pit Mining Area <br />The October 2006 landslide in the East Panel of Trapper Mine has resulted in a dramatic change in <br />planned mining methods at Trapper Mine. The K Pit and L Pit (f.k.a. G Pit) were originally planned as <br />dragline pits, consistent with Trapper's historic mining method. This pit layout is depicted on the M4 LOM <br />Map submitted and approved in PR-5. After extensive geotechnical study and mine planning efforts, it has <br />been determined that dragline mining is not a viable mining method for the K Pit due to the steeply dipping <br />structure. <br />i <br />After the East Panel landslide, Trapper retained Agapito Associates, Inc. (AAI) to perform geotechnical <br />investigation of the area to determine the causes and ramifications of the event. Numerous studies and <br />evaluations were performed by AAI personnel. A detailed analysis of AAI's findings is available in AAI's <br />January 2008 report, "Trapper G-Pit Landslide Mining Assessment" found in Appendix T. <br />The K Pit mining is now planned as a truck/loader operation. This method was selected as the safest <br />mining method and allows Trapper to recover coal resources in the affected area that would otherwise be <br />lost. Reserve estimates show approximately 8.6 million tons of recoverable coal in K Pit. Blocks B and C <br />of K Pit must be excavated to allow access to an additional 4.0 million tons in L Pd. Though this method is <br />a more expensive mining method, and requires a large capital purchase, it is the preferred mining method <br />for K Pit. This will result in a reclaimed landform that meets the requirements of Approximate Original <br />• Contours, and provides for long-term stability. <br />The general mine plan for the K Pit is to open the upper elevation of the mine area (designated as K Ridge <br />Pit) with a dragline. The slide plane has been determined to be a mudstone layer in the L seam roof. The <br />dragline bench for this pit will be below the subcrop of this seam, allowing the dragline to work from a <br />stable surface that is outside of the area affected by the slide. Dragline spoil will be cast into the area of <br />the Horse Gulch Fill. The truck/loader fleet will then open the B Blocks of the K Pit <br />Due to the steeply dipping pit floors, overburden removed by this fleet will be placed in permanent fills, <br />either the K Pit Buttress, or the Horse Gulch Fill. The B Block is, for all intents and purposes, a boxcut to <br />open the pit for mining. To minim0 th e chance of a spoil <br />er me slide origeinating updip of the active mining <br />operation, a slide th at could have the potential to n and quipment the K Pit Buttress and <br />endang <br />Hors e Gulch Fill are necessary . Upon completion of th e B Bkx3c, the fleet will move to the C Bkx*. Some <br />of this material will be placed in th e Horse Guch Fill; th e majority will be used to backfill B Bkxic. This <br />backfill will be placed to grade, as depicted on Sheet 3 of the M12 map. <br />L Pit (f.k.a. G Pit) Mining Area <br />L pit has been developed as a strikeline and dipline dragline pit over the years. L pit currently occupies <br />the eastern portion of the east panel landslide mass. Development of this pit will occur after the <br />completion of K pit stripping and will utilize a combination of truck and loader stripping and dragline <br />stripping. Development of L pit will occur early in the next permit term. It is necessary to develop blocks B <br />and C of K pit before reserves in L pit can be recovered. <br />Mining in Hawken pit (H-pit) was completed in April 1997. After performing reclamation activities, the <br />• Queen Anne dragline walked to Ashmore pit in May 1997. <br />Revision: Pp,-I° <br />1) -Al 3-15a '7(2( 0 <br />Approved: