Laserfiche WebLink
.Table IA-8. Summary of topsoil replacement Costs <br />Fleet Description <br /> Units Own Cost Op 6 OH Operator Cost ea. Total Cost <br />Equipment Required ea ($/hr) ea ($/hr) ($llrr) ("r) ($/hr) <br />Cat 637G (single shift) $ 313.18 $ 2,505.44 <br />Cat 16H $ 144.64 $ 144.64 <br />Cat D10R 0 ."" , . 5 134 13 S 78 $ 237.30 $ 118.65 <br />Water Truck -- - " 3473 $ ?3 54 $ 90.56 $ 67.92 <br />Total $ 254.30 $ 415.24 $ 116.14 $ 2,836.65 <br />Production Fleet <br /> Cubic Rate Scraper Fleet Cost Total <br />Area Yards (cydsRu) Hours Hours ($Mr) ($) <br />Ash Dump 401,523 209 1920 240.0 $ 2,836.65 $ 680,849 <br />D/E Pit 488,686 169 2899 362.4 $ 2,836.65 $1,027,909 <br />Z Pit 226,652 122 1856 232.0 $ 2,836.65 $ 658,073 <br />F Pit 89,958 110 815 101.8 $ 2,836.65 $ 288,868 <br />G Pit 1,064,040 184 5796 724.4 $ 2,836.65 $2,054,987 <br />AE Pit 210,251 154 1369 171 $ 2,836.65 $ 485,398 <br />West Panel 288,235 176 1634 204.3 $ 2,836.65 $ 579,495 <br />East Panel 504,918 156 3235 404.4 $ 2,836.65 $1,147,211 <br />Sub Total 3,274,263 168 19524 2440.5 $ 2,836.65 $6,922,789 <br />• <br />• <br />Revision: ,?2-Ct, <br />1-42 Approved: <br />---"- "-