Laserfiche WebLink
4) Please provide details in Exhibit E, Reclamation Plan, that fully explain what mitigation <br />measures the Forest Service will require if visual impacts become apparent. This <br />information is available within the Forest Service documents provided but needs to be <br />noted within the reclamation plan clearly so no confusion occurs with DRMS or the <br />general public as to what and when mitigation is required. <br />5) Related to #3, please provide a product information sheet and a cost estimate in Exhibit L <br />for the cost of implementing visual impact mitigations for a maximum of 1 acre <br />disturbance as proposed. <br />6) Please clarify in exhibit S that the house structures noted within 200 feet of the permit <br />boundary on the south side between the boundary and the county road are in fact owned <br />by Gallegos and not subject to damage waivers or site stability analysis. <br />Staff is completing a reclamation bond calculation at this time. The final amount however will <br />not be available until the costs for rock staining is factored in. Due to the fact that most of the <br />disturbance will be on Forest Service lands their concurrence on the bond amount will be <br />required. <br />If you need additional information, please contact me at the Division of Reclamation Mining and <br />Safety, Grand Junction Field Office, 101 S. 3rd St., Suite 301, Grand Junction, Colorado 81501, <br />telephone no. 970.241.1117. <br />Sincerely, <br />G. Russell Means <br />Environmental Protection Specialist 11