Laserfiche WebLink
WHIRLWIND MINE <br />Waste and Ore Pile Consumption <br /> Product ion Rate- Monthly <br /> <br /> <br />Month/Year <br />Ore <br />(ton) Waste <br />Rock <br />(ton) ; Moisture' <br />Content (11 <br />(percent) Water <br />Usage <br />(gal) <br />Year 1 Total 0 4,209 86,208 <br />November 2008 0 512 8.5 10,487 <br />December 2008 0 0 8.5 0 <br />January 2009 0 0 8.5 0 <br />February 2009 0 0 8.5 0 <br />March 2009 0 0 8.5 0 <br />April 2009 0 0 8.5 0 <br />May 2009 0 0 8.5 0 <br />June 2009 0 0 8.5 0 <br />Jul 2009 0 0 8.5 0 <br />August 2009 0 0 8.5 0 <br />September 2009 0 0 8.5 0 <br />October 2009 0 0 8.5 0 <br />Year 2 Total 0 512 10,487 <br />1 - Based on estimated moisture content of 8.5 percent (8 to 9 percent) <br />in ore and waste rock