Laserfiche WebLink
PROFESSIONAL EN IN <br />R'S CERTIFICATION <br />I, James M. Vattern a <br />registered Professional Engineer <br />in the State of Colorado. <br />certify that this map has been <br />reviewed by me and as <br />to TR -103 is true and correct to the <br />best of my knowledge <br />and information. <br />0 REGj <br />�p0 ...............• S <br />`,. o:_ F <br />M M James M. Vattern, CO PE No. 20537 <br />MR -193 <br />6/04/04 <br />L.0 37 Z, O <br />SCALE: 1 IN = 400 ET <br />CONTOUR INTERVAL 10 FEET <br />: <br />- - - TOPSOIL RECLAIM LIMITS <br />UEa <br />Date <br />zz <br />LIMITS FOR F AND G PITS <br />MCEIVE <br />AND RECLAIM <br />�( Z7 ZOOS <br />MR -199 <br />3/15/05 <br />K8 <br />REVISE F AND Z PIT LIMITS <br />TR -96 <br />Note: Production may fluctuate according to economic, <br />geologic, or other conditions. Limits are shown for <br />maximum possible production from 2003 through 2008. <br />Operations may actually progress slower than depicted <br />Back filling. radio and. to <br />to these maps. f <br />P 9. 9 9. P soil <br />laydown will follow mining operations in a timely <br />manner. <br />SHEET LOCATION INDEX <br />LCUCIYU PR -5 10/22/02 JMM TRAPPER MINE CRAIG, CO. I <br />MR -190 <br />9/05/03 <br />KR- <br />.,J RECLAIM <br />400 0 460 800 1200 <br />_,MITS FOR AE. F, G AND Z PITS <br />-- - - - - -- PERMIT BOUNDARY <br />TOPSOIL STRIPPING <br />MR -193 <br />6/04/04 <br />CHANGE TOPSOIL STRIP AND RECLAIM <br />SCALE: 1 IN = 400 ET <br />CONTOUR INTERVAL 10 FEET <br />: <br />- - - TOPSOIL RECLAIM LIMITS <br />.� <br />LIMITS FOR F AND G PITS <br />MCEIVE <br />AND RECLAIM <br />�( Z7 ZOOS <br />MR -199 <br />3/15/05 <br />K8 <br />REVISE F AND Z PIT LIMITS <br />TR -96 <br />8/22/05 <br />KS <br />MIDTERM RESPONSE AND <br />MINE PLAN REVISION <br />MR -206 <br />5/22/06 <br />JMM <br />CHANGE TOPSOIL STRIP LIMITS Di <br />FOR G PIT AND Z PITS <br />slon v , <br />j®QMIVd3pf0N= 400' <br />Sheet 2 of 3 <br />TR -98 <br />2/09/07 <br />JMM <br />2006 and 2007 MINE LIMITS <br />AND ADD G TEST PIT 120' BUFFER <br />TOPSOIL STRIP LIMITS Topographic information compiled from aerial photography dated 10/07. <br />DESIGNED BY: LDJ <br />DRAWN BY: LDJ,RDH <br />M 10 B <br />TIR - 103 <br />5/12/08 <br />JMM <br />REVISE 2008 TOPSOIL STRIP AND <br />RECLAIM LIMITS <br />Project: PR6 Design: m10b- ts- rclm -tr103 Plot: m106- tr103 -s2 <br />DATE: 10 -22 -02 <br />SHEET 2 <br />it„np��ain� <br />