Laserfiche WebLink
N 414000 <br />N 412000 <br />N 410000 <br />N 408000 <br />N 406000 <br />N 404000 <br />N 402000 <br />N 400000 <br />�OyED <br />5 2001 <br />�, �eclama <br />1nin9 and Safely <br />PROFESSIONAL ENGINEER'S CERTIFICATION <br />II <br />WYi Mattern a registered Professional Engineer seen <br />'b �� as PR -6true certif tr t and correct o �to the <br />•� P��` �y�:edge and information. <br />� ", <br />20537 2 cr ` Lames M. M attern, CO PE No. 20537 <br />S �a °�''` <br />Fs G� <br />/i.. S //1nm�F�..� Date <br />Note: Production may fluctuate according to economic. <br />geologic, or other conditions. Limits are shown for <br />maximum possible production from 2008 through 2012. <br />Operations may actually progress slower than depicted <br />on these maps. Bockfilling. grading, and topsoil <br />loydown will follow mining operations in a timely <br />manner. <br />SHEET LOCATION INDEX <br />LEGEND <br />-- - - - - -- PERMIT BOUNDARY <br />TOPSOIL RECLAIM LIMITS <br />TOPSOIL STRIP LIMITS <br />400 0 400 800 1200 <br />SCALE: 1 IN = 400 FT <br />CONTOUR INTERVAL: 10 FEET <br />Topographic information compiled from aerial photography doted 10/06. <br />Project: PR6 Design: m10b_ts— rclm_pr6 Plot: m10b— pr6 —s3 <br />Revision I Date I By I Description <br />PR -6 1 10/22/07 JMM PERMIT REVISION <br />TRAPPER HIDING INC. <br />TRAPPER MINE CRAIG, CO. <br />TOPSOIL STRIPPING <br />AND RECLAIM q /2/ky <br />Sheet 3 of 3 <br />.SCALE: 1 " = 400' <br />DESIGNED BY: SAP.RDH w/� <br />DRAWN BY: RDH M o <br />DATE: 10 -22 -07 SHEET 3 Sapper MnO <br />y`,hgghq`�q��hyyq`,gh��h <br />�4h4hk`�khh`�4g4h`�`�4hh <br />SHEET LOCATION INDEX <br />LEGEND <br />-- - - - - -- PERMIT BOUNDARY <br />TOPSOIL RECLAIM LIMITS <br />TOPSOIL STRIP LIMITS <br />400 0 400 800 1200 <br />SCALE: 1 IN = 400 FT <br />CONTOUR INTERVAL: 10 FEET <br />Topographic information compiled from aerial photography doted 10/06. <br />Project: PR6 Design: m10b_ts— rclm_pr6 Plot: m10b— pr6 —s3 <br />Revision I Date I By I Description <br />PR -6 1 10/22/07 JMM PERMIT REVISION <br />TRAPPER HIDING INC. <br />TRAPPER MINE CRAIG, CO. <br />TOPSOIL STRIPPING <br />AND RECLAIM q /2/ky <br />Sheet 3 of 3 <br />.SCALE: 1 " = 400' <br />DESIGNED BY: SAP.RDH w/� <br />DRAWN BY: RDH M o <br />DATE: 10 -22 -07 SHEET 3 Sapper MnO <br />