Laserfiche WebLink
L IT.R.G 4'Y�rn, a registered Professional Engineer <br />� <br />M � to q, 6}o rado, certify that this map has been <br />l' Qseb dsas to PR -6 is true and correct to the <br />k(Gf my kn �+g_e and Information. <br />20537 z <br />domes M. Mattern. 'CO PE No. 20537 <br />I Revision I <br />Date I <br />By <br />I <br />..��' <br />Date <br />Note: Production may fluctuate according to economic, <br />geologic, or other conditions. <br />Operations may actually progress slower than depicted <br />on these maps. Backfilling, grading, topsoil <br />laydown and facilities will follow mining operations <br />in a timely manner. <br />2 ' "3 <br />1 <br />SHEET LOCATION INDEX <br />O D <br />�w <br />- - w — sir <br />BUILDINGS OR STRUCTURE a 400 <br />AMOCO 6 INCH OIL PIPELINE <br />SCALE: 1 IN = 400 FT <br />XCEL ENERGY NATURAL GAS PIPELINE <br />CONTOUR INTERVAL: 10 FEET <br />TMI EXISTING POWER TRANSMISSION LINE <br />TMI FUTURE POWER TRANSMISSION LINE (YEAR BUILT PL EXT) <br />YVEA POWER TRANSMISSION LINE <br />TRI —STATE GENERATION POWER TRANSMISSION LINE <br />WESTERN AREA POWER ADMINISTRATION POWER TRANSMISSION LINE <br />800 1200 <br />I Revision I <br />Date I <br />By <br />I <br />Description <br />P - 6 <br />6/22/07 <br />KB <br />PERMIT REVISION <br />PR -6 <br />6/04/09 <br />JMM <br />PERMIT REVISION <br />FACILITIES <br />W 2 110 <br />Sheet 1 of 3 <br />�' ❑ SCALE: 1" = 400' <br />of t DESIGNED BY: —DJ M 13 /� <br />Mm�9 DRAWN BY: LDJ.KB.TMP,RH ,�/, /�+` <br />DATE:6 /22/07 SHEET 1 rhnndr wu,u <br />