Laserfiche WebLink
development in the Preliminary Processing Area and subsequent perpendicular <br />drive through the deposit southwestward. <br />c. Please find revised Exhibit L reflecting Reclamation Plan commitments. The new <br />proposed bond includes the worse case scenario of constructing slope over <br />mine benches. <br />Reclamation Estimate <br />GCC Rio Grande Inc <br />Fremont County <br />Direct Tasks Unit Quantity Cost Total Cost <br />Reconstructing approx 100 feet 31-1:1V slopes on 15 ft highwall <br />Fill material <br />Loader /truck <br />Dozer <br />with 50 <br />ft benches every 10 vertical feet <br />Drill <br />1,020 <br />manure <br />acre <br />cy1day <br />4400 <br />$1,95 4.20 <br />$ 453.02 <br />PIda <br />2300 <br />$1,539.20 <br />$ 682.60 <br />$ <br />1,504.00 <br />Subtotal <br />$ 1,135.62 <br />Placing surface material and <br />Subtotal <br />Drill <br />acres <br />manure <br />acre <br />Mulch <br />acre <br />Loader <br />10 <br />hours <br />8 <br />$ 188.00 <br />hours <br />$ <br />1,504.00 <br />Dump truck <br />hours <br />8 <br />$ 188.00 <br />55.00 <br />$ <br />1,504.00 <br />Dozer <br />Subtotal <br />hours <br />8 <br />$ 188.00 <br />$ <br />1,504.00 <br />Seeding <br />Subtotal <br />Drill <br />acres <br />Seed mix <br />acre <br />Mulch <br />acre <br />Tracking seed and mulch <br />10 <br />Dozer <br />hours <br />Mobilization fee <br />hours <br />Indirect Tasks <br />Liability insurance <br />Performance bond <br />Profit <br />Job Superintendent <br />Miscellaneous indirect <br />Assumptions <br />1. Reclamation will occur in a maximum of 10 acre phases <br />2. Process area will move onto pit floor in Phase 2 <br />Subtotal <br />$ 4,512.00 <br />10 <br />$ <br />75.00 <br />$ 750.00 <br />10 <br />$ <br />135.00 <br />$ 1,350.00 <br />10 <br />$ <br />55.00 <br />$ 550.00 <br />Subtotal <br />$ 2,650.00 <br />6 <br />$ <br />188.00 <br />$ 1,128.00 <br />2- 7 <br />$ <br />100.00 <br />$ 200.00 <br />Direct Expenses <br />Total <br />$ 9,625.62 <br />0.0155 <br />$ 149.20 <br />0.015 <br />$ 144.38 <br />0.1 <br />$ 962.56 <br />20 <br />$ <br />88.00 <br />$ 1,760.00 <br />Subtotal <br />$ 3,016.14 <br />0.0925 <br />1 $ 1,169.36 <br />Total Bond <br />$13,811.13 <br />Assumptions <br />1. Reclamation will occur in a maximum of 10 acre phases <br />2. Process area will move onto pit floor in Phase 2 <br />