Laserfiche WebLink
Truck/Loader Team Work cont'd Task # : 007 sheet 2 of 2 <br />Loading Tool Cycle Time : Number of loading tool passes required to fill truck : 5 passes <br />Excavators and front shovels - machine cycle time vs. job condition rating : AVERAGE <br />-selected value within basic rating: AVERAGE <br />Track loaders -material descr.: <br />- cycle time elements (min.) : Load <br />NA Maneuver: NA Dump: 0.100 <br />Wheel and track loaders - unadjusted basic loader cycle time ( load, maneuver, and dumF NA minutes <br />Cycle Time Factors <br />Loading Condition Description <br />Factor (min.) <br />Source <br />Material :NA <br />Adjusted loader cycle time (total time per loader pass) <br />NA <br />NA <br />Stockpile :NA <br />Net load time per truck * : <br />NA <br />NA <br />Truck ownership :NA <br />* bulk of 1st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />NA <br />NA <br />Operation :NA <br />0.700 <br />NA <br />NA <br />Dump target : <br />NA <br />NA <br />NA <br />Haul route <br />Road <br />segment# <br />Net cycle time adjustment: <br />NA <br />minutes <br />Total <br />resistance ( %) <br />Adjusted loader cycle time (total time per loader pass) <br />n 440 <br />minwi4ee <br />600 <br />Net load time per truck * : <br />1.860 <br />minutes <br />Truck Cycle Time: <br />* bulk of 1st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />804.53 <br />Truck exchange time * <br />: 0.70 minutes........ Adjusted for site altitude : <br />0.700 <br />minutes <br />Truck load time: <br />1.860 minutes........ Adjusted for site altitude : <br />1.860 <br />minutes <br />Truck maneuver and dump time: <br />1.10 minutes........ Adjusted for site altitude : <br />1.100 <br />minutes <br />`* set at 0 if exchange time < adj. loader cycle time (truck exchange completed during 1 st loader cycle) <br />Fleet size : <br />1 Team(s) Total job time: <br />Truck travel (haul & return) time: <br />Road condition :Firm, smooth, rolling, dirtllt. surfaced, watered, maintained <br />Unit cost : <br />Haul route <br />Road <br />segment# <br />Haul distance <br />(feet) <br />Grade <br />res. ( %) <br />Roiling <br />res. ( %) <br />Total <br />resistance ( %) <br />Speed <br />(feet/minute) <br />Travel time <br />(minutes) <br />1 <br />600 <br />0.00 <br />3.00 <br />3.00 <br />2983 <br />0.714 <br />804.53 <br />LCY /hr <br />Adjusted hourly single truck/loader team production : <br />747.73 <br />LCY /hr <br />XXXX <br />Adjusted hourly multiple truck/loader team production : <br />747.73 <br />LCY /hr <br />JOBTIME AND COS T .;:.;; :.:.................................................................................................................................................. <br />............................... <br />Fleet size : <br />1 Team(s) Total job time: <br />11.65 <br />Hours <br />Unit cost : <br />$1.217 /LCY Total job cost : <br />$10,601 <br />Keturn route : Haul time ** : 0.714 minutes <br />` travel time shown for each segment includes acceleration /deceleration adjustment Return time * *: 0.385 minutes <br />** total haul and return time shown includes altitude adjustment Total truck cycle time : 4 .759 minutes <br />Loading tool unit production : <br />900.88 LCY /hour...... Adjusted for job efficiency : <br />747.73 <br />LCY /hour <br />Truck unit production : <br />484.66 LCY /hour...... Adjusted for job efficiency : <br />402.27 <br />LCY /hour <br />Optimal no. trucks /loading tool : <br />2 trucks........... Selected no. trucks /loader : <br />2 <br />trucks <br />Adjusted hourly truck team production : <br />804.53 <br />LCY /hr <br />Adjusted hourly single truck/loader team production : <br />747.73 <br />LCY /hr <br />XXXX <br />Adjusted hourly multiple truck/loader team production : <br />747.73 <br />LCY /hr <br />JOBTIME AND COS T .;:.;; :.:.................................................................................................................................................. <br />............................... <br />Fleet size : <br />1 Team(s) Total job time: <br />11.65 <br />Hours <br />Unit cost : <br />$1.217 /LCY Total job cost : <br />$10,601 <br />