Laserfiche WebLink
EXHIBIT L - RECLAMATION COSTS <br />The reclamation costs are based on the point in time when it would be the <br />most expensive to reclaim the site. <br />TABLE L-1 SUMMARY OF RECLAMATION COSTS <br />COSTS AMOUNT <br />Disturbance Cost Total $191,300 <br />Contractor Mob/Demob (8%) $1,544 <br />Overhead (18.5%) $35751 <br />Administrative (5%) $965 <br />TOTAL PROPOSED BOND $251,560 <br />Disturbed Acreage 7.5 Acres <br />Bond Cost Per Acre $35408 <br />TABLE L-2 RECLAMATION COSTS <br />Item Unit Quanti Price Total <br />Regrade east, north & <br />south slopes from 2H:1 V <br /> <br />to 3H:1 V (1,616 linear Cubic Yard 3120 $1.25 $3,900 <br />Feet) <br />Remove Portable <br /> <br />Processing Equipment Lump Sum 1 $1,000 $1,000 <br />Backfill Wash Pond Cubic Yard 2400 $1.25 $3,000 <br />Scarify Prior to Topsoiling Acre 7.5 $100 $750 <br />Place 4" Topsoil Cubic Yard 3120 $1.25 $3,900 <br />Seed, Fertilize, Mulch Acre 7.5 $750 $59625 <br />Reseed <br /> <br />(20% non germination) Acre 1.5 $750 $1,125 <br />TOTAL COST $19,300