My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-06_INSPECTION - C1981048
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981048
>
2009-11-06_INSPECTION - C1981048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:49 PM
Creation date
11/20/2009 11:13:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
INSPECTION
Doc Date
11/6/2009
Doc Name
Inspection Report
Inspection Date
11/5/2009
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISION OF RECLAMATION MINING AND SAFETY <br />COAL INSPECTION REPORT <br />MINE NAME: Trinidad Basin ADDRESS: <br />OPERATOR: Revoked N/A <br />PERMITTEE: Same <br />COUNTY: Las Animas <br />OF OPERATION: SURFACE <br />IP NON - FEDERAL <br />PERMIT STATUS: RV AC= Active AP= Application in Review CO =Under Cease Order <br />IN= Inactive /Phase II Release PC= Permanent Cessation RV= Revoked SU= Suspended <br />TC= Temporary Cessation OR =Other <br />101 MINE ID OR EXPLORATION ID NO. C -81 -048 <br />INSPECTION DATE 11/05/2009 <br />INSPECTOR'S INITIALS KAG <br />TIME OF DAY (MILITARY TIME) 011:30 <br />INSPECTION TYPE CODE CP CC =Coal- Complete CP= Coal - Partial CX =Coal Exploration <br />AI =Aerial I L= Illegal Operation <br />POST INSPECTION CONTACTS NO NO =None BL =USBLM CE =US Corps of Engineers CH =Colo <br />Health Dept CL =Colo Land <br />JOINT INSPECT. AGENCY CODE NO Board, CT= Citizen, CW =Colo Wildlife, DE =U.S. <br />Energy, DW =US Wildlife, FS =U.S. Forest Service, HW =Colo Highway Dept, OS =OSM, SE =State Engineer <br />(Water Resources) <br />REASON FOR INSPECTION CODE SI AG =Other Agency Request CT= Citizen Complaint FU =TDN <br />Follow -up IE= Normal I&E Program MU =Memo of Understanding OF =OSM Special Focus ON =OSM NOV Follow <br />Up OS =OSM Oversight PR= Pre - operational S1 =Surety Release SR =Surety Related <br />Inspector did _did not V / receive documents during this inspection. (If any documents were received, provide a <br />narrative and a list of the documents in Section III of this report. <br />COMPANY REPRESENTATIVE RPRES % NT None <br />CO. REP. SIGNATURE (NA - Reufr m offi ) `/ <br />INSPECTOR'S SIGNATURE (Date) / / — 200 9 <br />WEATHER CODE CL CL= Cloudy CR =Clear RN= Raining SN= Snowing WD =Windy <br />INSPECTION REPORT ISSUANCE DATE November 6. 2009 <br />ired Entry <br />k1o" <br />YELLOW — Operator PINK — Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.