Laserfiche WebLink
III. COMMENTS - COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />This was a complete bond release inspection of exploration drill sites for the 2005 Big Elk Exploration <br />Program conducted by Jason Musick of the Colorado Division of Reclamation, Mining, and Safety <br />(Division) on 10 November 2009. Joe Shoemaker of Twentymile Coal Company accompanied the <br />inspection. The weather was clear during the inspection and the ground was dry. <br />This inspection was conducted to determine final bond release for 3 remaining sites drilled under NOI <br />X- 2005- 227 -00. All of the 3 sites drilled were properly reclaimed and abandoned. <br />Each site was located using the map and GPS coordinates provided by Scott Cowman. The results of <br />the inspection and photographs are identified below. <br />JCC 034 <br />