My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-17_INSPECTION - M1980244
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1980244
>
2009-11-17_INSPECTION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:01 PM
Creation date
11/20/2009 10:22:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
INSPECTION
Doc Date
11/17/2009
Doc Name
Work Plan
From
CC&V
To
DRMS
Inspection Date
9/14/2009
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />t? <br />Cripple Creek & Victor Gold Mining Company <br />A Joint Venture ANGLOGOLD ASHANTI (COLORADO) CORP Manager <br />Operations Office <br />P O Box 191 100 North 3 ' Street <br />Victor, Colorado 80860 <br />i 7191 689-2977 - Fax (7191689-3254 <br />SENT CFR 1*11=11:1). RF I ( RN RIVI.IPT RLQ(TSI FI) <br />700 3-2260-0004-8(IS2-i99? <br />No\cmbcr 16. 20110 <br />k <br />Mr. Berhan hellcle\\ <br />I:n\ ironnlcntal Protection Specialist <br />Colorado Department of Natural Resources <br />Di\ isiun of Rcclanlatioii. Mining and Safety C <br />Ofine of Mined Land Reclarnati011 <br />13 13 Sherman Street. Room 21 <br />D em er. Colorado 80203 <br />RC: <br />Dear Mr. hcf'tcle\\: <br />CC&V herein pro\Ides this response as requested h\ DRN1S in the inspection report dated September 14, <br />2009- This response is being pro\ ided to DBMS \\ithin 60 daVS of receipt of the inspection report, \\hich <br />was received b\ (V&V on September 24. 2009. <br />As noted in that inspection report, a potential problem ("PB") \\as identified \\ ith one ofthe Low Volume <br />Solulloll Collection S\stenl rI.VSCS") associated \\ilh the Valle\ Leach Facilit\ ("VLF") As a result. <br />(J'& .V submits the lilllo\\img, -\\ork plan- to increase the pumping capacity iOr Pump # I \\ ithin the Phase <br />IVh I.VSCS from the sump to meet that requirement for' it permanent solution liar maintaining less lhan 2' <br />of It\drostatic head \\ ithin the Phase IVb LVSCS sump. <br />Based on a re\ ic\\ of monitoring data b\ CCKV. the quantity of \\ater recovered bV the pumping systems <br />associated \\ ith the I.VSCS in Phase IVh appears to ha\ e increased from a t\ pica) approximate range of <br />60-90 gpm of combined Ilo\\ reco\e rcd b\ both Pump # 1 and Pump ?2 to a range of approxinuae l\ 80- <br />1 10 gpm ofcombiued flo\\. The llo\\ ol'water reeoVered h\ the Phase IVh I.VSCS pumping s\stenls at <br />these levels in the past have been managed h\ the t\\o existin2 punlpimu, s\stenls, \\hich could he <br />supplemented \\ ith the use of an external. gas-powered booster pump. This re\ ie\\ indicates that the <br />majority of the increase in tlo\\ r'ale of \\ater reporirng into the stamp is associated \\ ith Pump 41.
The URL can be used to link to this page
Your browser does not support the video tag.