Laserfiche WebLink
Table 1- Apache Mine .Replacement Plan Time Line <br />_ _ DATE AC'T'IVITY <br />June 2008 Field Trip to Apache Mine. Discuss what steps <br /> we need to take to for replacement water <br /> supply <br /> <br />July 2008 _ <br />Begin review of designated basin <br /> rules/regulations. Conduct research of <br /> geology, hydrology, water wells and the <br />...... _ nearby stream system. <br />September 2008 Research cost and sources of replacement <br /> water <br />November_ 2008 - Review replacement plan and well permitting <br /> requirements <br />April 2009 Determine scope of work for the preparation of <br /> a replacement plan and well permit application <br /> for submittal to the Colorado Ground Water <br />_ Commission <br />June to August 2009 Preparation of draft replacement plan including <br />_ figures, tables and spreadsheets <br />August 27, 2009 Communication with Keith Vander Horst <br /> about replacement plan. Discussion of <br /> alternate plan for obtaining replacement water <br />September 3, 2009 Discussion with Jason McGraw about status of <br /> the replacement plan and discussion of the <br /> alternate plan for replacement water <br />September 4, 2009 Communication with Peter Barkmarin of the <br /> Colorado Geological Survey discussing the <br /> Dawson Formation in the Calhan area and <br /> specifically at the Apache Mine <br />September 2009 Conduct geologic research to define extent of <br /> Dawson Aquifer in the Arapahoe Mine Area. <br />October 21,2009 Meeting ivith Robert Raynolds of the Denver <br /> Museum of Nature and Science to discuss the <br /> Dawson Formation in tine Apache Mine area.