My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-13_REVISION - M1977023
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977023
>
2009-11-13_REVISION - M1977023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:03:05 PM
Creation date
11/19/2009 8:28:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977023
IBM Index Class Name
REVISION
Doc Date
11/13/2009
Doc Name
Request for technical revision
From
United Companies
To
DRMS
Type & Sequence
TR2
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3, <br />W1, P.O. Box 3609 P.O. Box 1909 P.O. Box 103 P.O. Box 1556 <br />2273 River Road 21830 Hwy. 550 South 7255-1800 Rd. 27858 Huy 6 & 24 <br />Grand Junction, CO 81502 Montrose, CO 81402 Delta, CO 81416 Rifle, CO 81650 <br />(970) 243-4900 (970) 249-1815 (970) 874-9759 (970) 625-3738 <br />FAX: (970) 243-5945 FAX: (970) 240-8497 FAX: (970) 874-8326 FAX: (970) 625-5605 <br />November 9, 2009®V l 3 <br />1 ? 209 ©uP? 2049 ? <br />Division of Reclamation, Mining and Safety 4iy/s1 <br />ors .. <br />Attn: Bob Oswald o{ Ref s fety u i?ac`cj a <br />691 County Road 233 MWIN <br />Durango, CO 81.301 <br />RE: Request for Technical Revision to Ready Mix Pit M-1977-023 11 <br />Dear Mr. Oswald: <br />On September 15, 2009, you performed a routine inspection of the above mentioned gravel pit. During <br />your inspection you noted that fill material from outside the permit was being brought in from a current <br />construction project and dumped on-site. Per your inspection report, United either needs to provide <br />notice to DRMS if this is a short term activity, or provide a technical revision if this is going to be an <br />ongoing activity. <br />United would like to have an option of being able to import backfill material from construction activities <br />to this location moving forward. Therefore, please find this letter as a request for a Technical Revision <br />to our current permit. United also understands that each time material is brought into the permit area <br />from outside construction it will provide a notice to DRMS as outlined in Construction Materials Rule <br />3.1.5(9). 1 have also included the $216.00 fee for a technical revision. <br />Thank you for your time and consideration regarding this technical revision and if you have any <br />additional questions or concerns please do not hesitate to call me at 970-243-4900. <br />Best Regards, <br />e50 <br />Justin Aubert <br />Resource / Environmental Manager <br />Enclosure
The URL can be used to link to this page
Your browser does not support the video tag.