My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-12_REPORT - C1981022
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981022
>
2009-11-12_REPORT - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:55 PM
Creation date
11/17/2009 10:12:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REPORT
Doc Date
11/12/2009
Doc Name
2008 AHR Response to October 16, 2009 Division Adequacy Review
From
Oxbow Mining, LLC
To
DRMS
Annual Report Year
2008
Permit Index Doc Type
Hydrology Report
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />0 <br />XBOW MINING, LLC <br />j 3737 Hwy 133 P.O. Box 535 Somerset, Colorado 81434 USA Tel (970)929 -5122 Fax <br />(970)929 -5177 <br />!,November 6, 2009 <br />�Mr. Joseph J. Dudash K 2 � <br />Environmental Protection Specialist <br />!Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />I Re: Response to October 16, 2009 Division Adequacy Review, <br />2008 Annual Hydrology Report CDRMS Permit C -1981 -022 Oxbow Mining, LLC <br />Dear Mr. Dudash: <br />The Oxbow Mining, LLC., Elk Creek Mine has received the subject October 16, 2009 Adequacy Review <br />for the 2008 Annual Hydrology Report. The following information is submitted in response the <br />Division's review. <br />1. Surface Water Monitoring Site E -2 <br />Oxbow did indeed conduct a full suite analysis for site E -2 during the third quarter of 2008. A copy of a <br />revised table and graphs are included herein for inclusion into the 2008 AHR. <br />2 Surface Water Monitoring Site NF -l. <br />While Oxbow conducted field parameter analysis during the 4`" quarter of 2008, the full suite was over <br />looked. The full suite 4 quarter analysis has, however, been completed for 2009. <br />3. Ground Water Monitoring Site EC -14. <br />Oxbow did conduct a full suite analysis for site EC -14 during the third quarter of 2008. A copy of a <br />revised table and graphs are included herein for inclusion into the 2008 AHR. <br />Please contact me if you have any further questions concerning the contents of the 2008 AHR report. <br />Sincerely, <br />ames A. Kiger <br />Environmental Manager <br />Enclosures <br />j Xc: Marcia Talvitie ( CDRMS) <br />Jim Cooper (OMLLC) <br />files <br />• Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.