My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1994082 (46)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1994082
>
_INSPECTION - C1994082 (46)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 5:41:14 AM
Creation date
11/12/2009 9:29:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
INSPECTION
Doc Name
OSM Inspection Report
From
OSM
To
DRMS
Inspection Date
7/15/2009
Email Name
DTM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOR <br /> OFFICE OF SURFACE MINING <br /> Mine Site Evaluation State Program <br /> Permittee/ Penn t SENECA COAL COMPANY Number C-082-94 Field <br /> 1Date Visit 07/15/2009 Continuation Page <br /> Person <br /> 28. Performance Standard Categories <br /> Codes: 1=Compliance,2=Noncompliance,3=Not Planned,4=Not Started,5=Noncompliance Identified Elsewhere,6=Previously Cited <br /> A. Administrative D. Backfilling&Grading H. _Subsidence Control Plan <br /> 1._Mining within Valid Permit I, Exposed Openings I. Roads <br /> 2._Mining within Bonded Area 2. 1 Contemporaneous Reclamation 1. 1 Road Construction <br /> 3._Terms&Conditions of Permit 3. 1 Approximate Original Contour 2. Certification <br /> 4._Liability Insurance 4._Highwall Elimination 3. 1 Drainage <br /> 5._Ownership and Control 5. 1 Steep Slopes(includes downslope) 4. Surfacing and Maintenance <br /> 6. Temporary Cessation 6. Handling of Acid&Toxic Materials 5. 1 Reclamation <br /> 7._AML Rec.Fees--Non-Respondent 7. 1 Stabilization(rills and gullies) J. Signs&Markers <br /> 8._AML Rec.Fees--Failure to Pay E. Excess Spoil Disposal 1. 1 Signs <br /> B. Hydrologic Balance 1.- <br /> Placement 2. 1 Markers <br /> 1. 1 Drainage Control 2.- <br /> Drainage Control K. _Distance Prohibitions <br /> 2. Inspections&Certifications 3.- <br /> Surface Stabilization L. Revegetation <br /> 3. 1 Siltation Structures 4.- <br /> Inspections&Certifications 1. 1 Vegetative Cover <br /> 4._Discharge Structures F. Coal Mine Waste 2. 1 Timing <br /> 5.- <br /> Diversions (Refuse Piles/Impoundments) M. Postmining Land Use <br /> 6.- <br /> Effluent Limits 1._Drainage Control <br /> 7.- <br /> Ground Water Monitoring 2._Surface Stabilization N. Other <br /> 8. Surface Water Monitoring 3._Placement General <br /> 9. Drainage--Acid-Toxic Materials 4.- <br /> Inspections and Certifications Performance <br /> 10. 1 Impoundments 5. Impounding Structures Catagory <br /> 11._Stream Buffer Zones G. Use Of Explosives D 1 I)phase I bond release <br /> C. Topsoil&Subsoil 1._Blaster Certification - - <br /> 1. 1 Removal 2.-Distance Prohibitions -2) <br /> 2. Substitute Materials 3._Blast Survey/Schedule - <br /> 3. 1 Storage and Protection 4.-Warnings&Records - _3) <br /> 4. 1 Redistribution 5._Control of Adverse Effects <br /> Performance Standard Catagories E. Excess Spoil Disposal...........................................(816/817.71-74) <br /> 30 CFR Counterpart 1. Placement...........................................................................................71(e) <br /> A. Administrative...................................................................... 2. Drainage Control................................................................................71(f) <br /> 1. Valid Permit.....................................................................................773.11 3. Surface Stabilization...........................................................................71 g <br /> 2. Mining within Bonded Area................................................773.11 4. Inspections&Certifications...............................................................71(h) <br /> 3. Terms&Conditions of Permit.............................................773.17 F. Coal Mine Waste(Refuse Piles/Impoundments) .....(816/817.81-84) <br /> 4. Liability Insurance................................................................800.60 <br /> 5. Ownership and Control.......................................................778.13 1. Drainage Control...............................................................................83(a) <br /> 6. Temporary Cessation..............................842.11(e)&816/817.131 2. Surface Stabilization..........................................................................83(b) <br /> 7. AML Rec.Fees- Non-Respondant................................870.15(b) 3. Placement.......................................................................................... 83(c) <br /> 8. AML Rec.Fees--Failure to Pay.....................................870.15(a) 4. Inspections and Certifications...........................................................83(d) <br /> B. Hydrologic Balance......................................(816/817.41-57) <br /> 5. Impounding Structures...........................................................................84 <br /> G. Use of Explosives.................................................. 816/817.61-68) <br /> 1. Drainage Control........................................................................45 <br /> 1. Blaster Certification...........................................................................61(c) <br /> 2. Inspections&Certifications.............................................49(a)(10) <br /> 3. Siltation Structures......................................................................46 2. Distance Prohibitions.........................................................................61(d) <br /> 4. Discharge Structures...................................................................47 3. Blast Survey/Schedule.......................................................................62-64 <br /> 5. Diversions...................................................................................43 4. Warnings&Records......................................................................66&68 <br /> 6. Effluent Limits............................................................................42 5. Control of Adverse Effects......................................................................67 <br /> 7. Ground Water Monitoring 41(c) H. Subsidence Control Plan.........................................(817.121-122) <br /> 8. Surface Water Monitoring......................................................41(e) I. Roads.................................................................(816/817.150-151) <br /> 9. Drainage--Acid-Toxic Materials...........................................41(f) <br /> 10. Impoundments............................................................................49 1. Road Construction........................................................................... 1(a <br /> 11. Stream Buffer Zones...................................................................57 2. Certification................................................................................... .15 ) <br /> 3. Drainage...............................................................................150(b)-151-151(d) <br /> C. Topsoil&Subsoil...............................................(816/817.22) 4. Surfacing and Maintenance..................................................150(e)-151(d) <br /> .................................................................22 a 5. Reclamation............................................................................ ........150(f) <br /> 1. Removal................ ( ) .. <br /> 2. Substitute Materials.................................................................22(c) J. Signs&Markers.......................................................(816/817.11) <br /> 3. Storage and Protection.............................................................22(c) 11(a),(b),&(c) <br /> 4. Redistribution..........................................................................22(d) 1. Signs................................................................................... . <br /> 2. Markers......................................................................I I(a),(b),(d),(e),&(fl <br /> D. Backfilling&Grading..............................(816/817.95-107) K. Distance Prohibitions.......................................................(761.11) <br /> 1. Exposed Openings.....................816/817.13, 14, 15,&823.11 &21 L. Revegetation.....................................................(816/817.111-116) <br /> 2. Contemporaneous Reclamation..................................................100 <br /> 3. Approximate Original Contour..........................................102(a)(1) L Vegetative Cover.......................................................................111 &]16 <br /> 4. Highwall Elimination..................... 102(a)(2) 2. Timing................................................................................(................113 <br /> .................................... <br /> 5. Steep Slopes(includes downslope)............................................107 M. Postmining Land Use..............................a............... 816/817.133) <br /> 6. Handling of Acid&Toxic Materials......................................102(c) Pa e 2 of <br /> 7. Stabilization(rills and gullies)..................................................95(b) Revised December 4.1998 g - <br />
The URL can be used to link to this page
Your browser does not support the video tag.