Laserfiche WebLink
I T�%` U. S. DEPT. OF THE INTERIOR ��t^'�ENTOFTyFf2� <br /> R T' OFFICE OF SURFACE MINING <br /> .� Mine Site Evaluation <br /> �3.j o State Program GFOFSURFAG��\ <br /> 1. Permittee/Person 9. Permit Number 10. Permit Type <br /> MOUNTAIN COAL COMPANY C-80-007 PP <br /> 2.Address 11. Field Visit Date 12. Purpose 13. SRA Present <br /> 5174 HIGHWAY 133 07/29/2009 O� ❑Y <br /> 3. City 4. State mm-dd -yyyy <br /> 14. Permit Status 15. Site Status 16. Facility Type <br /> Somerset CO rA7 AP BF <br /> 5. Zip Code 6. Phone Number <br /> 17. OSM Office# 18. CCID# 19. Land Code <br /> 81434 (970)929-5030 140 SF <br /> 7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID# 21. State Abrev. 22. County Name <br /> S. Mine Name I I E <br /> `VEST ELK MINE 23. AVS Permittee Entity ID Number 24. State Office <br /> 25. Hours 16. Signature Block 27. Reviewing Official: <br /> 2.0 a. Permit Review <br /> 8,0 b. Site Visit Time Signature: Signature: <br /> H STRA��TD AND E SI-LYEFFER <br /> 6,0 c. Travel Time Review Date: 's /Z Zaaf <br /> Printed Name: mm-dd-yyyy <br /> 4.0 d. Report Writing Date: 1 08/25/2009 Is Supplemental MSE Page Used Y/N Y <br /> Permit Type -Item 10 IP=Interim Program, PP=Permanent Program , NP=No Permit <br /> Purpose Type Codes Item 12 CCR....Citizen Complaint Referral(non site visit) <br /> 0xx....Oversight RFx.... Reclamation Fees CC......Citizen Complaint(initial site visit) <br /> Axx....Assistance Fxx.....Federal Actions CCF....Citizen Complaint Follow-up <br /> Joint Inspection-Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br /> Permit Status-Item 14 AS....Abandoned:All surface and underground coal mining activities have ceased and <br /> operator has left the site without completing reclamation as defined in <br /> A.... Active:Coal mining and reclamation activities occurring or 30 CFR 840.11(g) <br /> ppermitted but not yet disturbed. AB1..Bond Forfeiture: Bond forfeiture officially in process or completed,and. <br /> IN....Inactive(Permanent Program Permit):Phase II completed or reclamation in progress or not yet commenced. <br /> Temporary Cessation of Operations. (Interim Program Permit) A62..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br /> Coal mining completed and reclamation activities initiated. used to reclaim site,but site not reclaimed to Program standards. <br /> BR...Bond Release:Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br /> Authority(RA)has released all of the bond(Phase III Release.) NA...Not Applicable:When site is unpermitted. <br /> Site Status Codes-Item 15 NS..Non-Site Visit:Status of site not determined. <br /> NO...No Disturbance:No coal mining and reclamation MC..Mining Complete:No mining activity on site, FP..Forfeiture Pending:The RA is pursuing <br /> operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit,collect the <br /> EX..Coal Exploration:Coal exploration operations TC..Temporary Cessation:The RA has granted pperformance bond(s),and/or reclama- <br /> have started and where coal mining operations cessation of mining pursuant to 30 CFR 816/ tion of forfeited site is in progress. <br /> have not begun. 817.131(b). FR..Forfeited and Reclaimed:Forfeiture <br /> AP..Active Coal Producing:Coal surface mining P1...Phase I Release: At least Phase I bond release reclamation completed. <br /> activities are occurring. granted for entire permitted area. For interim FO..Abandoned Site:Abandoned site that <br /> AN..Active Non-Producing:Active non-producing permits,partial bond release. is permitted but there is no bond. <br /> facility such as tipple or preparation plant. P2..Phase II Release: At least Phase II bond release WC.Wildcat:Coal mining and reclamation <br /> NM..No Mining: The Permit Status is active,site is for the entire permitted area. operations have or are taking place and <br /> not in Temporary Cessation,no surface coal P3,.Phase III Release: Reclamation completed and the activity is not covered by the <br /> mining activity,and site not regraded. the RA has released all bond. required permits from the RA. <br /> Facility Type Codes-Item 16 D...Ancillary(Haulroad,Conveyor,and/or Rails) H...Exploration Permits L...Remining site permitted <br /> A... Surface E...Refuse and/or Impoundment I...Notice of Intent to Explore under 30 CFR785.25 <br /> B... Underground F...Loading Facility and/or Tipple J...Exempt 16 and 2/3 <br /> C... Preparation Plant G...Stockpiles K...Government Financed Construction Exemption <br /> Small Business Regulatory Enforcement Fairness Act (SBREFA) <br /> Your Comments Are Important <br /> The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br /> small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each aaencv's <br /> responsiveness to small business. If you are a small business(a business with 500 or fewer employees including those of affiliates) Page 1 of <br /> and wish to comment on the enforcement or compliance activities of OSM,call 1-888-REG-FAIR(1-888-734-3247). Revi�d December 4,1998 <br />