Laserfiche WebLink
Table 3.7-1 Page 36 <br />CIRCES Cost Estimating Software <br />i~ <br />PROJECT IDENTIFICATION <br />Task # : 029 <br />Date : 12/162005 <br />User: JRS <br />State : Coorado <br />Pertnitlob # : C•1980A04 <br />County:Game/d Abbreviation :none <br />Site : Mcclana Canyon Mine <br />Filename :0004-029 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal O6 <br />task description :Seal Borehole from Minor Revision 37 <br />UNIT COSTS Equipment cost data source : ~~~~ Shift basis : ~~~1 cer day <br />BOREHOLE DESCRIPTION SEALING ITEM !METHOD DIAMETER LENGTH QUANTITY UNIT UNIT COST TOTAL COST <br />-Bottom Plug PVC plug - 6 in. 6" 250' 1.00 EA $115.31 $115.3 f <br />-Fill Hole with Cement Portland cement grout 6' 250' 19.00 bag $8.25 $156.75 <br />-Cut Casing at Sudace Exp. rasing removal, 4-8 in. 6" NA 1.00 LF $6.55 $6.55 <br />-Borehole Marker Borehole marker NA NA 1.00 EA $3.37 53.37 <br />-Drill Rig Time GENERIC 3.0 in. -500 ft. capy. NA NA 4.00 HR $74.75 $299.02 <br />-Water Truck Time Water Tanker, 2,500 Gal NA NA 4.00 HR $44.09 $176.35 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Jos COST Total Cost : $757 <br />