Laserfiche WebLink
« Table 3.7-1 Page 33 <br />I ~ I ROADABLE EQUIPMENT sheet 2 of 2 <br />Nearest major city or town within project area region : Grand Junction <br />~l Transportation Cvcle Time : Non- Total one-way travel distance : 35.0 miles <br />J Roadable Roadable Average travel speed : 45.0 mph <br />Haul time (hours) _ <br />Retum time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours} _ <br />Subtotals = <br />JOB TIME AND COST <br />0.78 0.78 Total non-roadable mob/demob cost' : $8,035.35 <br />0.78 0.78 • two round trips with haul rig <br />1.50 NA Tolal roadable mob/demob cost ": $0.00 <br />1.50 NA •• one round trip, no haul dg <br />4.56 1.56 <br />Total job lime : 9.11 hours <br />Total job cost : $8,035 <br />~~ <br />EQUIPMENT HAUL DISTANCE and TIME <br />