My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-20_PERMIT FILE - C1980004A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980004
>
2009-10-20_PERMIT FILE - C1980004A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:19 PM
Creation date
11/10/2009 10:28:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004A
IBM Index Class Name
Permit File
Doc Date
10/20/2009
Section_Exhibit Name
Tables 2.1-1 to 4.1-5
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3.7-1 Page 10 <br />•~ <br />Task # : 008 <br />Date : 12282005 <br />User: JRS <br />CtRCES Cost Estimating Software <br />State :Colorado <br />County :Garfield <br />Site : Mcclane Canyon Mine <br />Filename :0004-008 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Permit Renewal 06 <br />Task description :Pull Main Haul Road Fill Material to Base of Cut <br />HOURLY EQUIPMENT COST <br />PermiUob # : C-1980.004 <br />Abbreviation :none <br />Bench <br />Horsepower: 162 <br />Weight (MT) : 24.19 <br />Cost Breakdown : Utilization <br />Ownership wsUhour : $27.86 NA Shift basis : 1 per day <br />Operating cosUhour : $33.01 100 Data source : (CRG) <br />Operator costmour : $31.97 NA <br />Total unR cesUhour : $92.84 Total fleet cosUhour : $92.84 <br />... ,:. <br /> <br />MATERIAL QUANTITIES <br />_._ ._ . <br />Initial Swell Loose <br />volume : 6,050 BCY factor : 1.250 volume : 7,582 LCY <br />Source of estimated volume :Figures 2.2-1 and 3.1-1 <br />ICJ <br />Source of estimated swell factor :CAT Handbook <br />.. _. <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket, swing loaded, dump bucket swing _em <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.29 minutes <br />Bucket Caoaciri <br />Rated bucket capacity : 1.44 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.97 Sand and gravel (95% - 100%) <br />Adjusted bucket capacity : 1.40 LCY <br />Job Condition Corcection Factors Source <br />Site altitude : 5,600 feet Altitude adjustment : 1.00 (CatHB) <br />Job efficiency adjustment : 0.83 (1 shiff/day) <br />Netjob correction : 0.83 multiplier <br />Unadjusted hourly unit production : 287.51 LCY/hour <br />Adjusted hourly unit production : 238.63 LCY/hour <br />Adjusted hourly fleet production : 238.83 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total lob time : 31.69 hours <br />Unit cost : $0.389 per LCY Total job cost : $2,942 <br />Machine description :Cat 322C L <br />
The URL can be used to link to this page
Your browser does not support the video tag.