Laserfiche WebLink
Table 3.7-1 Page 5 <br />CIRCES Cost Estimating Software <br />Task # : 003 <br />Date : 12282005 <br />User: JRS <br />State :Colorado <br />County :Garfield <br />Site :Mcclane Canyon Mine <br />Agency w organization name :Colorado Division Of Minerals And <br />Permit or other job action :Permit Renewa106 <br />Task description : Recontour Easf Salt Creek <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Machine description :Cat 322C L <br />Area <br />Horsepower: 162 <br />Weight (MT) : 24.19 <br />Ownership cosUhour <br />Operating cosUhour <br />Operator cosUhour <br />Total unit cosUhour <br />MATERIAL QUANTITIES <br />Initial <br />volume : 50 BCY <br />Utilization <br />$27.86 NA <br />$33.01 100 <br />$31.97 NA <br />$92.84 <br />Total fleet cost/hour : $92.84 <br />Swell Loose <br />factor : 1.270 volume : 64 LCY <br />Source of estimated volume :Permit <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Excavator Cvde Time (load bucket swing loaded dump bucket, swing em <br /> Basicjob condition description : AVERAGE <br /> Secondary job condition within basic description : AVERAGE <br /> CyGe time value : 0.29 minutes <br />Bucket Capacity <br />Rated bucket capacity : 1.44 LCY (heaped) Bucket size Gass : medium <br />Bucket fill factor : 0.97 Sand and gravel (95% - 100%) <br />Adjusted bucket capacity : 1.40 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 5,600 feet Altitude adjustment : 1.00 (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shitt/day) <br /> Net job correction : 0.83 multiplier <br />PermiUob # :C-1980-004 <br />Abbreviation :none <br />Filename :0004-003 <br />Shin basis : 1 per day <br />Data source : (CRG) <br /> <br />