My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-20_PERMIT FILE - C1980004A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980004
>
2009-10-20_PERMIT FILE - C1980004A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:19 PM
Creation date
11/10/2009 10:28:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004A
IBM Index Class Name
Permit File
Doc Date
10/20/2009
Section_Exhibit Name
Tables 2.1-1 to 4.1-5
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`, <br />HOURLY RRODUCTIOtJ <br />Hauling Capacity <br />Scraper Payload (weight) Basis <br />Material weight : 2,650 pounds/LCY <br />MaterlaE description : <br />Earth - Ury packed <br />Rated payload : 48, 000 pounds <br />Payload capacity : f8.82 LCY <br />sheet 2 of 2 <br />Scraper Bowl {volume) Basis <br />Struck volume : 15.70 LCY <br />Heaped volume : 27.010 LCY <br />Average volume : 18.36 LCY <br />Adjusted capacity : 'l$,35 LCY *** <br />hourly production,reflects volume per scraper pair on push-pull models <br />Cvele Time : _ Uo <br />nd#ion Corrections : Site altitude (ft.) : 5,450 <br /> ~ Scraper Push dozer Source <br />Scraper loading time'* : 0.80 minutes. ~ Altitude adj.:, 7.000 NA (Gat HB) <br />Maneuver and spread time : 0.6~ minutes ~ Job efficiency :; 0.830 NA (Cat NBJ <br />• load time per scraper pair on push-putt modus ~ Net correction :I 0.830 NA <br />Travel time <br />Road condition. description :Firm, smooth, rolling, dirt/!f, surfaced, o-vafered, manfained <br />Haul Route : ~~ <br />Seg. # ' Hau! distance (feat) ;Grade (%) :Roll. res. (°1°} ~ Total res. (%) ~ Velocity (fpm) ~ Travef time (min.)*"' <br />1 1,000' 5.00 3.00 I 8:00 1381 0.79 <br />• <br />Return route <br />Haut time : 0.79 minutes <br />" travel time for each segment is adiusied for acceie~ationtdeceteratian. Return time : t?.47 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time {load + haul + maneuver and spread + return} : 2.70 minutes <br />Unadjusted unit productignlhour : 814:24 LCYlhour *"* Adjus#ed for job conditions : <br />~ 675.82 LCY/trour <br />Optimal number of scrapers per push dozer^ NA Selected number of scrapers : 2 scraper{s} <br />Adjusted single scraper team (unit) hourly production : &75.£T2 LCY/hour <br />Adjusted multiple scraper team (Meet} hourly production : 675.$2 LCY/hour <br />_. <br />JOB TIME AND COST <br />Fleet size : 9 Teem(s) Total job. time : 74.35 Hours <br />Unit cost : $0.668 1LCY Total job cost : $6,482 <br />
The URL can be used to link to this page
Your browser does not support the video tag.