Laserfiche WebLink
2.05.3(71 Coal Handline Structures <br />• Coal will be loaded by a front-end loader directly from <br />the pit into haul trucks. No coal handling structures will be <br />utilized. <br />2.05.3(8) Coal Mine Waste and Non-Coal Processing Waste <br />The handling of the overburden and spoil from the open <br />pit mining operation is discussed in Sections 2.05.3(6) & <br />2.05.4(2). <br />Waste oil and grease will be disposed of in two <br />ways. During summer months some of the waste oil generated can <br />be added to diesel fuel and consumptively used. All other waste <br />oil and grease will be accumulated is metal storage containers <br />and periodically picked up by an approved waste oil service. <br />Waste paper, lumber, garbage etc. will be accumu- <br />lated in a container, dumpster, designed for that purpose and <br />periodically picked up by a commercial trash service. <br />The oil and grease, paper, lumber, .garbage etc. <br />will be stored at the mine office facilities and parking area. <br />Refer to section 2.05.4(2)(f) for additional <br />details on handling non-coal waste. <br />• 2.05.3(9) Return of Coal Mine Waste to Abandoned Workings <br />Not applicable to surface mines. <br />2.05.3(10)Return of Cosl Processing Waste to Abandoned Workings <br />Not applicable to surface mines. <br />• 2.05-16 May 1991 <br />