Laserfiche WebLink
0 LIST OF ATTACHMENTS <br />Attachment No. Description <br />20-A Pit Backfill Stability Report <br />20-B 2006 Neckpit Slide Remediation Plan <br />20-C Turf Reinforcement Mat Design and Installation Information <br />20-D Shrub Plot Slide Remediation Plan <br />20-E Pond 016 Slide Remediation Plans <br />20-1 Postmining Drainage Channel Designs <br />20-2 Permanent Structures <br />LIST OF EXHIBITS <br />Exhibit No. Description <br />20-1 Eliminated <br />20-1A Eliminated <br />20-2 Postmining Topography and Drainage <br />20-3 Post Disturbance Topography - TAHR <br />20-4.1 Pre and Postmining Slopes Cross Section S-1 <br />20-4.2 Pre and Postmining Slopes Cross Sections S-2 and S-3 <br />20-4.3 Pre and Postmining Slopes Cross Sections S-4, S-5, and S-6 <br />20-4.4 Pre and Postmining Slopes Cross Sections N-1 and N-2 <br />20-4.5 Pre and Postmining Slopes Cross Sections II-W South Area <br />20-5.1 006 Channel Profiles <br />20-5.2 (Replaced by 20-5.1) <br />20-5.3 (Replaced by 20-5.1) <br />20-5.4 (Replaced by 20-5.1) <br />20-5.5 (Replaced by 20-5.1) <br />20-5.6 Postmining Stream Channel 005-E1 <br />20-5.7 Postmining Stream Channel 005-Gulch <br />20-5.8 Postmining Channel 005-W1 <br />• <br />TR-66 ii 8/09