Laserfiche WebLink
. TABLE 20-1 <br />POSTMINING LANDFORM MASS BALANCE <br />(NORTH AREA) <br />Preminina Pit Material Volume Calculations <br />Premining Material Volume 49,694,919 cy <br />Virgln Overburden Material Volume 9,073,200 cy <br />Total In-Place Coai Volume 9,621,719 cy <br />Recoverable Coal Volume 9,010,123 cy <br />Non-Recovered Coal and Parting Material Volume 11,596 cy <br />Premining Overburden Volume 40,684,796 cy <br />Total Pit Spoil Volume 46,909,570 cy <br />Preminina Material Mass Volume: <br />Total Pit Spoil Mass Volume = 46,909,570 cy <br />Total Premining Material Volume = 49,694,919 cy <br />Volume to Achieve Premining Original Ground Surface = 2,785,349 cy <br />• % Difference = -5.6 <br />Average Elevation Change of Disturbed Lands = -3.7 ft <br />Postminino Material Volume Calculations <br />Postmining Spoil Material Calculated: <br />Postmining Spoil Material Volume (Internal) 46,878,503 cy <br />Postmining Spoil Material Volume (External) 348.505 cv <br />Total Postmining Spoil Volume 47,227,008 cy <br />Postminino Overburden Materia! Excavated <br />Premining Total Pit Spoil Volume 46,909,570 cy <br />Postmining Overburden Material (External) 1.627.342 cv <br />Total Overburden Material Excavated (Swelled) 48,536,912 cy <br />Postminino Material Volume Comparison <br />Total Postmining Spoil Volume 47,227,008 cy <br />Total Overburden Material Excavated 48.536.912 cv <br />. Volume Difference 1,309,904 cy <br />Difference = -2.7 <br />PR-05 7 Revised 01/06 <br />