Laserfiche WebLink
• TABLE 20-1 <br />POST MINING LANDFORM MASS BALANCE <br /> Areal Area 2 <br />Pre-Mining Pit Material Volume Calculations <br />Pre-Mining Material Volume 12,404,306 bcy 31,738,823 bcy <br />Virgin Overburden Material Volume 9,623,200 bcy 27,087,354 bcy <br />Total In-place Coal Volume 2,781,106 bcy 4,651,469 bcy <br />Recoverable Coal Volume 2,526,900 bcy 4,186,322 bcy <br />Non-recovered Coal and Parting Material Volume 254,206 bcy 456,147 bcy <br />Pre-Mining Overburden Volume 9,877,406 bcy 27,552,501 bcy <br />Total Pit Spoil Volume 11,062,694 Icy 30,858,801 Icy <br />Pre-Mining Material Mass Volume: <br />Total Pit Spoil Volume 11,062,694 Icy 30,858,801 Icy <br />Total Pre-Mining Material Volume 12,404,306 bcy 31,738,823 bcy <br />• <br />Post Mining Material Volume Calculations <br />Post Mining Spoil Material Calculated: <br />Post Mining Spoil Material Volume (Internal) 9,967,208 cy 31,502,979 cy <br />Post Mining Spoil Material Volume IExternall 186,012 cy - <br />Total Post Mining Spoil Volume 10,153,220 cy 31,502,979cy <br />Post Mining-Overburden-Material-Excavated - - - --- ------- --- --- - __-__ <br />Pre-Mining Total Pit Spoil Volume 11,062,695 cy 30,858,801 cy <br />Post Mining Overburden Material IExternall 99.612 cy -- <br />Total Overburden Material Excavated (Swelled) 11,162,577 cy 30,858,801 cy <br />Post Mining Material Volume Comparison <br />Total Post Mining Spoil Volume 10,153,220 cy <br />Total Overburden Material Excavated 11,162,577 cy <br />Volume Difference 1,009,357 cy <br />u <br />31,502,979 cy <br />30,858,801 cy <br />644,178 cy <br />4 Revised 2/99 <br />