Laserfiche WebLink
• For channels lined with rock riprap, the PADER Method is used to estimate the required rock size. <br />However, based on SCC experience, the PADER Method seems to underestimate the required rock size, <br />so SCC adds 3 inches to the rock Deo size specified by PADER for design purposes. For further protection <br />of the channel bed, a layer of geotextile fabric is installed prior to placement of the riprap. <br />u <br />• <br />TR-37 ga Revised 02/08 <br />